Northwire Canada EditionTuesday, July 28, 2026
Northwire
LUG 81.27 +2.4% ETG 2.65 +1.1% ARIC 0.860 +2.4% ABC 0.020 +0.0% WEC 0.010 +0.0% NTB 0.020 +0.0% URC 3.83 −8.2% BEX 0.085 +6.2% SUM 1.32 +0.0% FMN 0.270 +10.2% PHNM 0.405 +12.5% HDRO 1.11 −6.7% PWM 0.620 −1.6% LIO 0.155 +10.7% NTH 0.160 +1.6% ELEF 0.120 −4.0% LUG 81.27 +2.4% ETG 2.65 +1.1% ARIC 0.860 +2.4% ABC 0.020 +0.0% WEC 0.010 +0.0% NTB 0.020 +0.0% URC 3.83 −8.2% BEX 0.085 +6.2% SUM 1.32 +0.0% FMN 0.270 +10.2% PHNM 0.405 +12.5% HDRO 1.11 −6.7% PWM 0.620 −1.6% LIO 0.155 +10.7% NTH 0.160 +1.6% ELEF 0.120 −4.0%
Drill Results

Medaro Mining Announces Exploration Program at Bastnas Project in Sweden

MEDA · Price

Executive Summary

  • Medaro Mining Corp. has entered into an exploration services agreement with McKnight Resources AB to commence a field‑based geological program at the Bastnäs project in Sweden, targeting REE, copper, cobalt, gold and base‑metal potential.
  • Field activities are slated to begin on or about March 20, 2026, subject to local conditions and logistics.
  • The program will cover systematic mapping, sampling (historic waste, outcrops, soils/tills), geophysical surveys, laboratory analysis, and integrated interpretation to prioritize targets for future work.

Key Details

  • Agreement: Exploration services agreement with McKnight Resources AB to support execution of the Bastnäs exploration program.
  • Start Date: Field activities expected to commence on or about March 20, 2026.
  • Project Scope:
  • Reconnaissance and detailed geological mapping focusing on lithological contacts, alteration, structural controls, and historic workings.
  • Targeted sampling of historic mine waste/dump material and accessible outcrops for geochemical REE evaluation.
  • Prospecting with follow‑up rock sampling; selective soil/till sampling to expand target areas.
  • Ground geophysical surveys (magnetic and gravity) to delineate structures and prospective zones.
  • Laboratory analysis of collected samples at accredited facilities; compilation into a consolidated dataset.
  • Integrated interpretation and reporting for target ranking and planning subsequent exploration phases.
  • Permit Area: Bastnäs 100 (≈263.68 ha) and Bastnäs 200 (≈866.60 ha); total ≈1,130.28 ha; permits valid through February 2029 under Sweden’s Minerals Act.
  • Mineral Focus: REE (including scandium, yttrium, lanthanum/lanthanides), copper, cobalt, gold, silver, lead, zinc, iron‑oxide copper‑gold (IOCG), volcanogenic massive sulphide (VMS) and skarn‑hosted magnetite‑REE mineralization.
  • Historical Context: District has historic mining; 2019 drill program in nearby area totaled 5,568 m in 15 holes (provided for context only). No verification by a Qualified Person for historical data.
  • Qualified Person: Amanda Scott, P.Geo., FAusIMM, reviewed and approved the scientific and technical information per NI 43‑101.

Notable Quotes

  • “The Company’s objective is to generate geological observations and analytical data to support target definition and evaluation of potential follow‑up work.” – Mark Ireton, CEO & Director, Medaro Mining Corp.
Read the original news release →

More from Medaro Mining Corp.