
Troilus drills high-grade connector zone extensions while a $1.2 billion debt close and ESIA approval remain the primary catalysts for the project.
Troilus Drills 1.15 g/t AuEQ Over 37 m, Including 3.84 g/t AuEQ Over 5 m, at Connector Zone, Extending High-Grade Mineralization Within Current Mine Plan Area