The Desk
AI-assisted analysis on every release · Page 76- Drill Results01
Galway completes a 5,000m drill program at Estrades, with assay results currently pending and no new grade data available.
Sep 15, 2026 · 07:00 · GWM · Galway Metals Inc. · Neutral
- Technical Study02
Orezone’s 14-year Casa Berardi PEA yields a $1.05 billion NPV despite currently holding zero reserves.
Sep 15, 2026 · 06:30 · ORE · Orezone Gold Corporation · Routine +
- Financings03
Ganfeng Lithium closes an $180 million note, eliminating its 2027 debt overhang and securing the path to production at the PPG project.
Sep 15, 2026 · 06:30 · LAR · Lithium Argentina AG · Routine +
- Drill Results04
Bonterra’s VG deposit returned a 0.4m veinlet at high grade within a 1.4m interval averaging 0.24 g/t.
Sep 15, 2026 · 06:01 · BTR · Bonterra Resources Inc. · Neutral
- Technical Study05
Metallurgical tests confirm high recoveries and effective arsenic removal for NGEx.
Sep 15, 2026 · 06:00 · NGEX · NGEx Minerals Ltd. · Routine +
- Drill Results06
Arizona Eagle reports high-grade silver sampling extending a corridor, while cash burn and dilution weigh on shares.
Sep 15, 2026 · 05:01 · AZEM · Arizona Eagle Mining Corp. · Neutral
- Drill Results07
Tiger reports its highest grade intercept at Ceibal, though true width and continuity remain unresolved for this offset infill hole.
Sep 15, 2026 · 05:01 · TIGR · Tiger Gold Corp. · Routine +
- Drill Results08
P2’s Gabbs SW step-out drill hole thickens the bulk gold-copper system without repeating the high-grade bonanza intercepts seen in previous drilling.
Sep 15, 2026 · 05:00 · PGLD · P2 Gold Inc. · Routine +
- Drill Results09
Soma reports high-grade near-mine vein intersections at Cordero, though the results are insufficient to alter the company's distressed producer narrative.
Sep 15, 2026 · 04:20 · SOMA · Soma Gold Corp. · Routine +
- Production / Operations10
JZR stabilizes its plant and ships 11 tonnes of concentrate to São Paulo.
Sep 15, 2026 · 04:00 · JZR · JZR Gold Inc. · Routine +
- Drill Results11
Rua repeats a 0.6m high-grade intercept but discloses no new assay results or true widths for the deposit.
Sep 15, 2026 · 03:44 · RUA · Rua Gold Inc. · Neutral
- Financings12
Bitterroot secures a US$5.2 million DPA award to fund drilling at the LM deposit, though it still requires matching funds.
Sep 15, 2026 · 03:31 · BTT · Bitterroot Resources Ltd. · Material +
- Production / Operations13
Lundin’s weather-driven delays at Caserones cut tests keep the Vicuña final investment decision as the primary catalyst for the project.
Sep 15, 2026 · 03:26 · LUN · Lundin Mining Corporation · Routine −
- Drill Results14
Sienna begins maiden Nevada gold drilling, funding its multi-asset exploration push with cash reserves.
Sep 15, 2026 · 03:02 · SIEN · Sienna Resources Inc. · Routine +
- Drill Results15
Orosur’s first El Cedro hole intersected 61m of low-grade gold, with vein assays pending to determine the true width and grade of the mineralisation.
Sep 15, 2026 · 02:01 · OMI · Orosur Mining Inc. · Routine +