
Magna’s Levack restart delivers a 92% internal rate of return despite lacking reserves and carrying a seven-year mine life.
Magna Mining Reports Results of Levack Mine Preliminary Economic Assessment and Approves Restart of Production

Magna Mining Reports Results of Levack Mine Preliminary Economic Assessment and Approves Restart of Production
Salazar Resources Closes $3.5 Million Non-Brokered Private Placement
Largo Receives Environmental Permit for GAN Open Pit Vanadium-Copper-Gold-PGM Mine Development
Canstar Resources Nears Completion of Phase 1 Till Sampling at Its 100%-Owned Skellefte VMS Project in Northern Sweden
Ivanhoe Mines Reports 76,401 Tonnes of Copper Produced by Kamoa-Kakula for Q3 2026
AuMEGA Metals Discovers 100.5 g/t Gold Sample at the Intersection Project
G Mining Ventures Reports Q3 2026 Preliminary Production Results
K92 Mining Announces Strong Q3 Production of 49,776 oz AuEq, Multiple Operational Records and 1 moz AuEq Production Milestone
ARRAS MINERALS DRILLS 574 METRES @ 0.40% CUEQ (0.23 G/T AU, 0.11% CU, 0.76 G/T AG, 38.84 PPM MO) AT BEREZSKI CENTRAL AND INTERSECTS 22.8 METRES @ 5.37 G/T AU ON THE NEWLY DEFINED EPITHERMAL TARGET AT K-OZEK IN KAZAKHSTAN
Brunswick Exploration Reports 1.31% Li2O Over 202 Metres Including 85 Meters at 1.73% Li2O at the Anatacau Main Project
Silver Range Resources Ltd. Options Alamo and Sand Springs to Resilience Minerals Limited
Total Metals Mobilizes Drill Rig to its High-Grade High Lake Gold Project, Northwestern Ontario
Fredonia files NI 43-101 report for El Dorado Monserrat
LEADING EDGE MATERIALS SIGNS MoU WITH TRILLIUN FOR NORRA KARR NEPHELINE SYENITE AND AEGIRINE CO-PRODUCTS
Pacific Booker Minerals Inc. to Upsize Non-Brokered Private Placement