
Arizona Gold & Silver Drills Multiple Higher Grade Gold Intervals within Significantly Wider Mineralized Structure - 76.5 Metres at 2.36 gpt Gold and 16.24 gpt Silver Beginning at 265.8 Metres on the Philadelphia Project, Arizona
Arizona Gold & Silver Drills Multiple Higher Grade Gold Intervals within Significantly Wider Mineralized Structure - 76.5 Metres at 2.36 gpt Gold and 16.24 gpt Silver Beginning at 265.8 Metres on the Philadelphia Project, Arizona