Northwire Canada EditionSaturday, July 25, 2026
Northwire
B 0.150 +0.0% IFOS 2.28 −2.6% IMM 0.060 +0.0% ROCK 3.38 −1.7% NVX 0.250 −7.4% HAR 0.050 +0.0% YGT 0.175 +0.0% GEN 0.070 −nan% CRB 0.040 +14.3% MSA 7.07 +2.2% AEM 204.81 +0.7% OPW 0.105 +5.0% GRL 0.275 −1.8% AIS 0.150 +0.0% CUU 0.580 −1.7% SOMA 0.720 +5.9% B 0.150 +0.0% IFOS 2.28 −2.6% IMM 0.060 +0.0% ROCK 3.38 −1.7% NVX 0.250 −7.4% HAR 0.050 +0.0% YGT 0.175 +0.0% GEN 0.070 −nan% CRB 0.040 +14.3% MSA 7.07 +2.2% AEM 204.81 +0.7% OPW 0.105 +5.0% GRL 0.275 −1.8% AIS 0.150 +0.0% CUU 0.580 −1.7% SOMA 0.720 +5.9%
Drill Results

Max Power Mining outlines Lucky Lake target area

MAXX · Price

Executive Summary

  • Max Power Mining Corp. announced the discovery of a new, large natural hydrogen target called Lucky Lake in the northwestern corner of its 200‑km Genesis trend (Southern Saskatchewan).
  • Lucky Lake shares key geophysical and structural characteristics with the previously disclosed Lawson target and is situated near major hydroelectric power, potash mining infrastructure, and the city of Saskatoon.
  • The company will commence detailed analysis and prioritize drill targets, positioning Lucky Lake as a cornerstone for Canada’s first commercial natural hydrogen program.

Key Details

  • Target Location: Northwestern corner of the Genesis trend, Southern Saskatchewan; near Gardiner Dam hydroelectric source and within two‑hour drive of Saskatoon.
  • Geophysical Signature: Interpreted as a “mobile zone” – higher‑density rocks with low magnetic response, indicative of serpentinization (hydrogen‑producing process).
  • Structural Setting: 2‑D trade seismic shows complex structures from basement movement, Devonian salt dissolution, and recent igneous intrusions—similar to Lawson target.
  • Exploration Plan: Immediate detailed analysis, acquisition of additional trade data, and prioritization of drill targets; deep drilling program slated for Q4 2025 (first dedicated natural hydrogen well).
  • Infrastructure Advantages: Proximity to Gardiner Dam hydroelectric power, adjacent potash mining corridor, and major population centre (Saskatoon) facilitating rapid commercialization pathways.
  • Management Comments:
  • Steve Halabura, Chief Geoscientist – highlighted the high‑quality target pipeline and scalability of Genesis for natural hydrogen.
  • Mansoor Jan, CEO – emphasized the addition of Lucky Lake to the exploration model, enhancing shareholder leverage and positioning Max Power as a leader in Canada’s emerging clean‑energy frontier.
  • Qualified Person: Technical information reviewed and approved by Steve Halabura, P.Geo., FGC, FEC (honours), per NI 43‑101 standards.

Notable Quotes

“Lucky Lake underscores how a pipeline of high‑quality targets is developing at Genesis as we review an abundance of early‑stage prospects with a disciplined scientific approach.” – Steve Halabura, Chief Geoscientist

“Our work at Lucky Lake reinforces the scale and momentum of the Genesis trend… Max Power is well positioned to lead this emerging clean energy frontier.” – Mansoor Jan, CEO

Read the original news release →

More from Max Power Mining Corp