Northwire Canada EditionWednesday, November 11, 2026
Northwire
⌕
Gold 4,030.20 −2.0% Silver 51.23 −2.8% Copper 6.27 −1.2% Oil 86.04 −0.9% Palladium 1,024.00 +0.2% NVX 0.910 +0.0% MSR 0.435 +0.0% ELE 22.85 −4.0% ALS 53.01 −2.2% APM 5.13 −6.6% AVL 5.46 −5.4% NG 8.84 −9.0% ATY 0.220 −2.2% CN 0.125 −10.7% PMET 3.22 −4.2% ITH 1.99 −11.6% VMET 12.33 −6.9% ABX 56.41 −5.6% PUR 0.370 +8.8% SCY 0.085 +6.2% AUMN 0.300 +7.1% Gold 4,030.20 −2.0% Silver 51.23 −2.8% Copper 6.27 −1.2% Oil 86.04 −0.9% Palladium 1,024.00 +0.2% NVX 0.910 +0.0% MSR 0.435 +0.0% ELE 22.85 −4.0% ALS 53.01 −2.2% APM 5.13 −6.6% AVL 5.46 −5.4% NG 8.84 −9.0% ATY 0.220 −2.2% CN 0.125 −10.7% PMET 3.22 −4.2% ITH 1.99 −11.6% VMET 12.33 −6.9% ABX 56.41 −5.6% PUR 0.370 +8.8% SCY 0.085 +6.2% AUMN 0.300 +7.1%
Drill Results

Anteros Metals Provides Operational Update on Phase 1 Extension Drilling at the Seagull Critical Minerals Project, Ontario

ANT · Price

Executive Summary

  • Anteros Metals announced the upcoming mobilization and restart of the Phase 1 extension drilling program at the Seagull Critical Minerals Project, with crew arrival expected around February 23, 2026.
  • The extension will target the previously intersected pressurized gas occurrence at ~877 m depth (hole RM26‑01) and evaluate associated sulphide mineralization, including a potential re‑entry of hole WM00‑05 for an additional ~115 m of drilling.
  • Laboratory assay results from hole RM26‑01 are pending; the company will provide further updates as drilling resumes and data become available.

Key Details

  • Program Operator: Rift Minerals Inc., under the option/JV agreement that could grant Anteros up to a 49% interest in the project.
  • Mobilization Timeline: Drill on site; mobilization to next pad imminent; full crew expected on/around Feb 23, 2026; drilling to recommence shortly thereafter, subject to field conditions.
  • Key Historical Intercept (RM26‑01): Pressurized gas occurrence at ~877 m depth within a narrow fault zone in Archean basement rocks of the Quetico Subprovince; casing sealed at surface for monitoring and potential gas sampling.
  • Proximity to Prior Gas Encounter: RM26‑01’s gas zone is ~100 m from hole WM01‑08, which also reported pressurized gas in 2001.
  • Sulphide Mineralization (RM26‑01): Discontinuous orthomagmatic sulphide mineralization intersected between ~589–608 m depth in the basal cumulate sequence of the Seagull Intrusion; assays pending.
  • Geological Context: The Seagull Intrusion comprises thick mafic‑ultramafic sequences (lherzolite, pyroxenite) that can undergo serpentinization, potentially generating hydrogen.
  • Planned Extension Work:
  • Re‑entry candidate hole WM00‑05; may involve casing refurbishment and ~115 m of extension drilling to test the ~877 m elevation gas occurrence.
  • Potential wedging to further assess basal sulphide mineralization depending on results and operational considerations.
  • CEO Quote: “The proposed Phase 1 extension represents a logical next step… while minimizing additional expenditure.” – Trumbull Fisher, CEO.
  • Assay Results: Pending laboratory analysis for RM26‑01; no independent verification of historic platinum‑palladium mineralization.

Notable Quotes

“The proposed Phase 1 extension represents a logical next step to build on observations from RM26-01 and advance our understanding of the Seagull critical minerals system,” said Trumbull Fisher, CEO of Anteros.


Materiality Assessment: Non‑Material – Positive (operational update with forward‑looking elements but no immediate financial impact).

Read the original news release →

More from Anteros Metals Inc.