Northwire Canada EditionWednesday, July 29, 2026
Northwire
ACS 0.070 +0.0% EMPR 0.840 +0.0% CYG 0.140 +0.0% IZN 0.080 +33.3% XXIX 0.110 +0.0% MERG 0.815 −4.1% LEGY 0.880 +0.0% GTWO 9.22 −3.2% CDA 0.890 +0.0% AUMB 0.580 +0.0% BOL 0.075 +15.4% ABRA 13.80 −4.2% GMIN 40.70 −3.3% PBM 0.045 +0.0% AEF 0.150 +3.5% EDCU 0.425 −6.6% ACS 0.070 +0.0% EMPR 0.840 +0.0% CYG 0.140 +0.0% IZN 0.080 +33.3% XXIX 0.110 +0.0% MERG 0.815 −4.1% LEGY 0.880 +0.0% GTWO 9.22 −3.2% CDA 0.890 +0.0% AUMB 0.580 +0.0% BOL 0.075 +15.4% ABRA 13.80 −4.2% GMIN 40.70 −3.3% PBM 0.045 +0.0% AEF 0.150 +3.5% EDCU 0.425 −6.6%
Production / Operations

Cdn Critical has $247,000 (U.S.) in July sales from BRM

CCMI · Price

Executive Summary

  • Canadian Critical Minerals reported $247,000 USD of revenue from the sale of stockpiled copper‑gold‑silver material shipped from the Bull River Mine in July 2025.
  • The sold material comprised 1,580 dry metric tonnes grading 1.86% Cu, 0.71 g/t Au and 14.4 g/t Ag.
  • Proceeds will be applied to ongoing care & maintenance costs at Bull River and to fund engineering studies needed for the final permit application to restart mill and underground operations.

Key Details

  • Revenue: Approximately US$247,000 received as provisional payment for July 2025 shipments.
  • Volume Shipped: 1,580 dry metric tonnes of sorted mineralized material transported to New Afton.
  • Grades of Sold Material: 1.86 % Cu, 0.71 g/t Au, 14.4 g/t Ag.
  • Use of Proceeds:
  • Offset care‑and‑maintenance expenses for the Bull River Mine (BRM).
  • Fund engineering studies supporting the final permit application to restart mill and underground operations.
  • Operational Status: Underground portion of BRM remains maintained in a de‑watered condition.