Northwire Canada EditionFriday, August 14, 2026
Northwire
NPK 0.870 +1.2% GRZ 6.26 −1.4% AVL 5.23 +3.0% TSLV 0.085 −5.6% MPVD 0.015 +0.0% DNG 6.61 +0.0% GLO 0.610 −4.7% CTGO 27.39 +0.5% SKE 45.73 −1.1% MTA 12.63 −0.7% VMET 14.15 +1.8% IMM 0.065 +0.0% LMCU 9.60 −1.9% EFF 0.025 −16.7% AYA 37.44 −4.2% MDM 0.060 +0.0% NPK 0.870 +1.2% GRZ 6.26 −1.4% AVL 5.23 +3.0% TSLV 0.085 −5.6% MPVD 0.015 +0.0% DNG 6.61 +0.0% GLO 0.610 −4.7% CTGO 27.39 +0.5% SKE 45.73 −1.1% MTA 12.63 −0.7% VMET 14.15 +1.8% IMM 0.065 +0.0% LMCU 9.60 −1.9% EFF 0.025 −16.7% AYA 37.44 −4.2% MDM 0.060 +0.0%
Drill Results

Allegiant Gold begins drill program at Eastside

AUAU · Price

Executive Summary

  • Allegiant Gold Ltd. has launched a fully‑financed 2,000 m diamond core drill program at the McIntosh zone of its Eastside gold‑silver project, part of a larger planned 20,000 m campaign.
  • The initial three holes (ES‑331, ES‑337, ES‑338) will test vertical extensions of high‑grade intercepts previously reported in 2021, with results expected October–November 2025.
  • Successful drilling could substantially increase the inferred resource and redefine the growth potential of the Eastside deposit at depth.

Key Details

  • Program Scope: 2,000 m initial HQ core program (holes ES‑331, ES‑337, ES‑338) within a planned 20,000 m drill campaign (both reverse‑circulation and diamond core).
  • Target Zones:
  • ES‑331 & ES‑338 – vertical extensions of historic holes ES‑239 and ES‑243 down to ~600 m depth.
  • ES‑337 – angled hole designed to intersect additional structures in the high‑grade zone, minimum 600 m length.
  • Historical High‑Grade Intercepts (2021):
  • Hole ES‑243: 148 m @ 2.6 g/t Au (including 14 m @ 21.9 g/t Au and 20 m @ 173.8 g/t Ag).
  • Hole ES‑239: 3.1 m @ 39.0 g/t Au within a broader 111.3 m interval @ 1.45 g/t Au.
  • Resource Context: Eastside currently holds ~1.4 Moz inferred gold and ~8.8 Moz inferred silver (July 2021 estimate); only a small portion of the project has been explored.
  • Exploration Model: Based on >60,000 m of drilling, geophysics, geochemistry, lithology, and structural data; shows strong grade‑structure correlation.
  • Timeline: Drilling underway; assay results anticipated in October–November 2025.
  • Future Plans: Upon completion of property‑wide geophysical work, reverse‑circulation drilling will commence on additional targets.

Notable Quotes

“We are excited to have started our 2025‑2026 drill program at Eastside; this is our largest single program ever at Eastside… If successful, this program could redefine the growth potential of the Eastside deposit at depth.” – Peter Gianulis, CEO, Allegiant Gold Ltd.

Read the original news release →

More from A2 Gold Corp.