Drill Results
Banyan's Recent Drillholes Demonstrate Continuity of High Grade with 1.85 g/t Au over 26.9m at Powerline Deposit, Yukon, Canada

BYN · Price
Executive Summary
- Banyan Gold announced multiple high‑grade gold intercepts from diamond drill holes AX‑25‑660, 664 and 667 at the Powerline deposit (AurMac Project, Yukon), supporting continuity of mineralized zones beyond the current pit‑constrained Mineral Resource Estimate.
- Intercepts include 1.85 g/t Au over 26.9 m (including 5.91 g/t Au over 3.5 m) and several >6 g/t Au short intervals, indicating potential to convert waste blocks within the conceptual pit to ore blocks.
- The results advance Banyan’s goal of defining ≥5 Moz of gold at >1 g/t and suggest further resource expansion in the northeast Powerline area.
Key Details
- Hole AX‑25‑660: 62.0 m @ 0.93 g/t Au; includes 26.9 m @ 1.85 g/t Au, 3.5 m @ 5.91 g/t Au, 0.7 m @ 15.40 g/t Au, 0.5 m @ 21.50 g/t Au, and 1.5 m @ 9.00 g/t Au.
- Hole AX‑25‑664: 19.5 m @ 1.12 g/t Au; includes 5.0 m @ 3.36 g/t Au, 0.5 m @ 6.30 g/t Au, 1.5 m @ 8.53 g/t Au, and 2.0 m @ 6.00 g/t Au (plus additional high‑grade intervals).
- Hole AX‑25‑667: 17.9 m @ 1.34 g/t Au; includes 1.5 m @ 6.03 g/t Au and 1.4 m @ 5.22 g/t Au.
- Total drilling to date in 2025: >29,000 m (127 holes) on the AurMac Project, with ongoing programs.
- Geologic interpretation aims to convert waste blocks within the pit‑constrained MRE (Indicated: 1.42 Moz @ 0.95 g/t; Inferred: 3.13 Moz @ 0.98 g/t) into ore, expanding the resource envelope.
- Qualified Person: Duncan Mackay, VP Exploration, reviewed and approved all data.
- Upcoming presentations: GCFF Conference (Vancouver, Sep 20‑2025), 121 Mining Investment Hong Kong (Sep 24‑25‑2025), 121 Mining Investment Global Online (Oct 14‑15‑2025).
Notable Quotes
“These results advance our target of defining 5 million ounces of plus 1 g/t. Specifically, these holes from the Powerline deposit are focused on converting waste blocks that fall within the footprint of the conceptual pit where the mineralized domains are only truncated based on a lack of drilling,” – Tara Christie, President & CEO.
“Building on our success from last year in redeveloping our geologic model and achieving nearly one‑to‑one conversion ratio for inferred to indicated in our MRE, we are further refining our model utilizing structural data… Specific mineralized domains can be traced in Powerline adding continuity to high‑grade zones,” – Duncan Mackay, Vice President Exploration.
More from Banyan Gold Corp.
Jul 28, 2026 · 06:00