GOLD 4321.20 +0.5% SILVER 64.80 +1.2% COPPER 6.77 −0.3% OIL 92.41 −2.3% PALLADIUM 1276.00 −0.5% SMP 0.055 +0.0% NVX 1.10 +12.2% AORO 0.015 +0.0% HAWK 0.025 +25.0% LOD 0.400 +0.0% SBMI 0.135 +3.9% PA 0.160 +3.2% BARU 0.060 +9.1% MKA 0.800 +8.1% GCN 0.030 +0.0% IAU 2.48 +1.6% CS 14.54 −0.2% LGO 0.750 −22.7% REVX 1.99 +19.2% OMI 0.320 +12.3% VLD 0.430 +0.0% GOLD 4321.20 +0.5% SILVER 64.80 +1.2% COPPER 6.77 −0.3% OIL 92.41 −2.3% PALLADIUM 1276.00 −0.5% SMP 0.055 +0.0% NVX 1.10 +12.2% AORO 0.015 +0.0% HAWK 0.025 +25.0% LOD 0.400 +0.0% SBMI 0.135 +3.9% PA 0.160 +3.2% BARU 0.060 +9.1% MKA 0.800 +8.1% GCN 0.030 +0.0% IAU 2.48 +1.6% CS 14.54 −0.2% LGO 0.750 −22.7% REVX 1.99 +19.2% OMI 0.320 +12.3% VLD 0.430 +0.0%
Technical Study

Western Exploration Files Amended NI 43-101 Technical Report for the AURA Gold Silver Project

WEX · Price

Executive Summary

  • Western Exploration filed an amended technical report (NI 43‑101) for the Aura Project, correcting cost table inconsistencies and updating the Base Case all‑in sustaining cost to US$1,172/oz Au.
  • The amendment does not change any underlying inputs or economic outcomes of the previously announced PEA; the company reconfirms the original PEA economics (Base Case NPV US$94.7 M, IRR 31.8%).
  • Detailed capital and operating cost tables for the Doby George deposit are provided, confirming total pre‑production capital of US$127.6 M and LOM sustaining costs of US$22.24/tonne processed.

Key Details

  • Amended Technical Report – Effective June 17 2025; filed on SEDAR+. Prepared by RESPEC Company LLC and Kappes, Cassidy & Associates (qualified persons).
  • Key Clarifications
  • Corrected inconsistencies in capital and operating cost summary tables (sections 1.10, 1.11, 21, 21.1 of the Initial Report).
  • Updated Base Case AISC: US$1,172/oz Au (previously reported US$1,152/oz). No impact on other PEA inputs or outcomes.
  • PEA Economics – Table 1 (re‑affirmed)
Metric Base Case Upside Case
Gold price (US$/oz) 2,150 3,000
Avg. annual operating cash flow (US$) 63.3 M 112.1 M
Pre‑tax NCF (US$) 132.4 M 336.5 M
Pre‑tax NPV₅ (US$) 94.7 M 265.9 M
Pre‑tax IRR (%) 31.8% 75.7%
After‑tax NCF (US$) 103.7 M 271.2 M
After‑tax NPV₅ (US$) 70.7 M 211.2 M
After‑tax IRR (%) 25.4% 62.2%
Payback period (years) 2.7 1.4
  • Project Capital Costs – Table 2
  • Pre‑production capital: US$127.6 M (Mining $2.8 M, Pre‑stripping $14.7 M, Processing/Support $78.5 M, Owners’ costs $9.0 M, Indirect $2.3 M, EPCM $7.9 M, Working capital $12.4 M).
  • LOM sustaining capital: US$10.5 M (Processing/support $10.3 M, Mining $0.2 M).

  • Project Operating Costs – Table 3 (LOM total US$253.6 M; US$22.24 per tonne processed)

  • Mining: US$153.0 M ($13.42/t)
  • Processing: US$77.2 M ($6.77/t)
  • General admin: US$23.4 M ($2.05/t)

  • Qualified Persons – Michael S. Lindholm (RESPEC, geology & MRE), Travis Manning (KCA, processing design), Kyle Murphy (RESPEC, mine planning).

  • Access – Full amended report available on Western Exploration’s website and SEDAR+ under the issuer profile.

Notable Quotes

(No direct quotes were included in the release.)

Read the original news release →

More from Western Exploration Inc.