Northwire Canada EditionWednesday, August 12, 2026
Northwire
S 0.250 −2.0% VOXR 7.22 −0.4% NFG 2.32 +0.0% MFG 3.70 +0.0% ITH 3.90 +1.8% DML 4.59 +0.0% SEVA 0.285 −5.0% CLM 0.055 −8.3% ORE 2.65 −0.4% OOR 0.050 +0.0% MJS 0.095 −5.0% DBG 2.01 −1.0% MOG 0.630 +8.6% CRE 0.340 −4.2% GNG 0.100 +0.0% XTG 2.72 +3.0% S 0.250 −2.0% VOXR 7.22 −0.4% NFG 2.32 +0.0% MFG 3.70 +0.0% ITH 3.90 +1.8% DML 4.59 +0.0% SEVA 0.285 −5.0% CLM 0.055 −8.3% ORE 2.65 −0.4% OOR 0.050 +0.0% MJS 0.095 −5.0% DBG 2.01 −1.0% MOG 0.630 +8.6% CRE 0.340 −4.2% GNG 0.100 +0.0% XTG 2.72 +3.0%
Drill Results

Super Copper Commences Field Programs to Advance Drill Targeting

CUPR · Price

Executive Summary

  • Super Copper Corp. has mobilized its geological team to the field for exploration programs at its flagship Chilean copper projects, Cordillera Cobre and Castilla.
  • The programs aim to define and refine drill targets; results are expected in Q4 2025 and will guide an upcoming drilling campaign.
  • Activities include core logging, systematic sampling, IP surveys, ground magnetometry, and property‑wide prospecting to build a robust geochemical dataset.

Key Details

  • Cordillera Cobre Program – Drill Target Definition
  • Work underway in high‑priority zones: El Alto, Calcite Hill, Mina Anima, North/Northwest areas.
  • Core logging & sampling of historical drill core for re‑interpretation of mineralization trends.
  • Systematic surface and underground sampling to expand known mineralized zones.
  • Induced Polarization (IP) surveys to locate chargeability/resistivity anomalies indicative of sulphide bodies at depth.
  • Ground magnetometry to refine geological models and improve drill orientation planning.

  • Castilla Program – Foundation for Drill Planning

  • First‑pass, property‑wide prospecting program launched to establish a systematic geochemical dataset.
  • Goal: identify zones of interest and generate a pipeline of targets for future drill testing.

  • Exploration Infrastructure

  • Recently completed roadwork to El Alto improves site access.
  • Access to a laboratory for core cutting and logging is now in place.
  • Contracted geophysics providers with regional experience are engaged.

  • Progress & Timeline

  • Geological teams are currently in the field completing the outlined programs.
  • Results will be released as work is finalized, expected in Q4 2025, with updates on target generation and drill planning.

  • Qualified Person Statement

  • Technical information prepared/approved by Michael Dufresne, M.Sc., P.Geol., P.Geo., qualified under NI 43‑101.

Notable Quotes

“This fieldwork is about getting us to the next stage: drilling. Cordillera already hosts multiple zones of interest where surface work and geophysics are expected to give us a clear picture of where to drill first… Together, these programs set us up to move decisively into drilling with confidence in our target models.” – Zachary Dolesky, CEO, Super Copper Corp.

Read the original news release →

More from Super Copper Corp.