Drill Results
Quarterback completes phase I exploration at Twin

QB · Price
Executive Summary
- Quarterback Resources Inc. completed its Phase I exploration program at the Twin Gold Project, including geochemical sampling of historic core (177 samples), rock grab sampling (10 samples), and an ortho‑lidar survey.
- The company performed reclamation work on the historic Twin camp site to prepare for future drilling in 2025.
- Results from the geochemical assays will be released when available, providing new data to refine the geological model and assess bulk‑tonnage gold potential.
Key Details
- Geochemical core sampling: 177 core samples submitted for assay to fill historic gaps and confirm prior results.
- Rock grab sampling: 10 rock grab samples collected from the main Takla‑Rainbow mineralized zone.
- Ortho/LiDAR survey: Completed across the Takla‑Rainbow zones and access road, establishing a baseline for permitting and future work.
- Site reclamation: Dismantled derelict infrastructure, performed site contouring, and improved road access at the historic Twin camp site.
- Exploration context: Phase I built on 2024 activities that identified new soil geochemical anomalies, mineralization styles, and extended known zones; total historic drilling on the project comprises 109 holes (21,878 m) with >15 mineralized zones.
- Future plans: Results of the geochemical portion will be disclosed when available; a Phase II drill program is slated for 2025 based on these findings.
Notable Quotes
(No direct quotes were provided in the release.)