Northwire Canada EditionSunday, November 29, 2026
Northwire
⌕
Gold 3,668.50 +3.8% Silver 43.70 +9.1% Copper 5.52 +3.4% Oil 83.33 −0.4% Palladium 879.00 +5.5% MUN 0.285 +11.8% RNCH 0.030 +0.0% GSKR 2.30 +8.0% ADY 0.370 +5.7% TSK 0.640 +1.6% BAY 0.055 +22.2% CGNT 0.670 −2.9% INFI 0.190 +0.0% GSS 0.045 +50.0% HAY 0.040 +0.0% WRLG 0.430 +1.2% MPVD 0.015 + GGO 0.980 +5.4% NAU 0.530 +6.0% COCO 0.260 +8.3% TBLL 0.045 +12.5% Gold 3,668.50 +3.8% Silver 43.70 +9.1% Copper 5.52 +3.4% Oil 83.33 −0.4% Palladium 879.00 +5.5% MUN 0.285 +11.8% RNCH 0.030 +0.0% GSKR 2.30 +8.0% ADY 0.370 +5.7% TSK 0.640 +1.6% BAY 0.055 +22.2% CGNT 0.670 −2.9% INFI 0.190 +0.0% GSS 0.045 +50.0% HAY 0.040 +0.0% WRLG 0.430 +1.2% MPVD 0.015 + GGO 0.980 +5.4% NAU 0.530 +6.0% COCO 0.260 +8.3% TBLL 0.045 +12.5%
Drill Results

Quarterback completes phase I exploration at Twin

QB · Price

Executive Summary

  • Quarterback Resources Inc. completed its Phase I exploration program at the Twin Gold Project, including geochemical sampling of historic core (177 samples), rock grab sampling (10 samples), and an ortho‑lidar survey.
  • The company performed reclamation work on the historic Twin camp site to prepare for future drilling in 2025.
  • Results from the geochemical assays will be released when available, providing new data to refine the geological model and assess bulk‑tonnage gold potential.

Key Details

  • Geochemical core sampling: 177 core samples submitted for assay to fill historic gaps and confirm prior results.
  • Rock grab sampling: 10 rock grab samples collected from the main Takla‑Rainbow mineralized zone.
  • Ortho/LiDAR survey: Completed across the Takla‑Rainbow zones and access road, establishing a baseline for permitting and future work.
  • Site reclamation: Dismantled derelict infrastructure, performed site contouring, and improved road access at the historic Twin camp site.
  • Exploration context: Phase I built on 2024 activities that identified new soil geochemical anomalies, mineralization styles, and extended known zones; total historic drilling on the project comprises 109 holes (21,878 m) with >15 mineralized zones.
  • Future plans: Results of the geochemical portion will be disclosed when available; a Phase II drill program is slated for 2025 based on these findings.

Notable Quotes

(No direct quotes were provided in the release.)

Read the original news release →

More from Quarterback Resources Inc