Northwire Canada EditionWednesday, August 12, 2026
Northwire
CRE 0.345 −2.8% GNG 0.100 +0.0% XTG 2.62 −0.8% LIFT 2.90 +1.1% ANK 0.325 −4.4% FIN 0.105 +0.0% BTO 7.17 +1.6% SGD 17.05 −0.8% CNC 1.55 −1.0% EFR 20.45 −0.7% UTWO 0.350 +0.0% LVX 0.540 +1.9% BONE 0.035 +0.0% CLCH 1.13 +0.9% DRY 0.305 +0.0% PUMA 0.130 +0.0% CRE 0.345 −2.8% GNG 0.100 +0.0% XTG 2.62 −0.8% LIFT 2.90 +1.1% ANK 0.325 −4.4% FIN 0.105 +0.0% BTO 7.17 +1.6% SGD 17.05 −0.8% CNC 1.55 −1.0% EFR 20.45 −0.7% UTWO 0.350 +0.0% LVX 0.540 +1.9% BONE 0.035 +0.0% CLCH 1.13 +0.9% DRY 0.305 +0.0% PUMA 0.130 +0.0%
Drill Results

Athena Gold begins diamond drilling at Excelsior

ATHA · Price

Executive Summary

  • Athena Gold Corp. has begun its first-ever diamond drilling campaign at the 100 % owned Excelsior Springs project in Nevada, fully financed by Mammoth Minerals under an earn‑in option.
  • The program will expand geological understanding of high‑grade gold mineralization and includes a second drill rig arriving soon to accelerate work.
  • Historic intercepts being targeted include multiple >30 m intervals with grades up to 16.30 g/t Au, underscoring the project's upside potential.

Key Details

  • Financing: Drilling is fully funded by Mammoth Minerals Ltd., which holds an option to earn an 80 % interest in Excelsior Springs over five years; Athena retains a free‑carry to a definitive feasibility study.
  • Equity Position: Athena owns 32 million ordinary shares of Mammoth Minerals, valued at approximately AU$5.12 million.
  • Drilling Program: First diamond drill rig on site; a second rig is expected shortly to expedite the campaign.
  • Target Intercepts (historical):
  • 51.8 m @ 4.00 g/t Au from 39.6 m (hole 22_01), including 6.1 m @ 16.30 g/t Au from 42.7 m.
  • 33.5 m @ 5.35 g/t Au from 41.2 m (hole DB23), including 10.7 m @ 15.99 g/t Au from 41.2 m.
  • 32.0 m @ 2.45 g/t Au from 44.2 m (hole 22_02), including 6.1 m @ 10.00 g/t Au from 45.7 m.
  • 24.4 m @ 3.62 g/t Au from 70.1 m (hole EX2), including 9.2 m @ 7.99 g/t Au from 79.2 m.
  • Metallurgical Testing: Core will undergo leaching tests to define processing pathways and expected metal recoveries.
  • Geotechnical Logging: Completed to support future development studies.
  • Channel Sampling: Recently finished across the historic Blue Dick underground mine (high‑grade silver); samples submitted for expedited assay.
  • Surveys: Property‑wide magnetic and LiDAR surveys have commenced across Excelsior Springs.
  • Historical Context: Prior drilling at the project was reverse‑circulation; diamond drilling provides superior structural data for interpreting controls on mineralization.
  • Qualified Person Review: Technical information reviewed by Benjamin Kuzmich, P.Geo., VP Exploration, Athena Gold (NI 43‑101 qualified person).

Notable Quotes

(No direct quotes provided in the release.)

Read the original news release →

More from Athena Gold Corp