Northwire Canada EditionMonday, July 13, 2026
Northwire
CPAU 0.150 +3.5% MMX 0.075 +7.1% IE 12.47 −2.4% SASK 1.09 −1.8% MOG 0.390 +2.6% XIM 0.070 −6.7% S 0.110 −29.0% OMI 0.300 −4.8% BMM 3.85 +1.3% CGD 0.630 +10.5% OCG 0.275 −1.8% CAMB 0.960 −4.0% HMR 0.590 −4.8% GOFL 0.025 +0.0% SIG 1.02 −1.0% SGQ 0.400 +33.3% CPAU 0.150 +3.5% MMX 0.075 +7.1% IE 12.47 −2.4% SASK 1.09 −1.8% MOG 0.390 +2.6% XIM 0.070 −6.7% S 0.110 −29.0% OMI 0.300 −4.8% BMM 3.85 +1.3% CGD 0.630 +10.5% OCG 0.275 −1.8% CAMB 0.960 −4.0% HMR 0.590 −4.8% GOFL 0.025 +0.0% SIG 1.02 −1.0% SGQ 0.400 +33.3%
Production / Operations Routine +

Pantera Silver Completes Drone Magnetic and Satellite Topography Surveys at Rakanco Silver Project, Advancing Drill Target Definition

Pantera Advances Rakanco Surveys, Divests Mexico Assets

Executive Summary
  • Most Recent Event: On April 15, 2026, Pantera Silver announced the completion of high-resolution drone magnetic and satellite topography surveys at its Rakanco Silver Project in Bolivia.
  • Progression: This follows a March 17, 2026 announcement where these surveys were commenced alongside a decision to relinquish the Nuevo Taxco project in Mexico.
  • Next Steps: The company is moving into an Induced Polarization (IP) survey phase, geological mapping, and systematic sampling to refine drill targets.
  • Strategic Shift: The portfolio review announced in March 2026 confirmed a focus shift entirely toward the Rakanco project in Bolivia, abandoning Nuevo Taxco without additional obligations.
  • Geological Context: Surveys target subsurface structures (faults, lithological contacts) within the Carangas district, known for epithermal silver systems adjacent to the Todo Santos mine.
Material Impact
  • Execution Confirmation: The April 15 news confirms the company is executing its planned exploration program as outlined in October 2025 financing and March 2026 updates. This validates management's ability to deploy capital efficiently.
  • No New Discovery Data: While positive, this update does not contain assay results or a drill campaign announcement. It is an intermediate step (survey completion) rather than a discovery milestone.
  • Portfolio Optimization: The relinquishment of the Mexico project (announced March 2026) reduces administrative overhead and concentrates risk on the higher-priority Bolivia asset, which is viewed positively by management but does not immediately impact revenue or reserves.
  • Capital Efficiency: The completion of surveys without additional financing suggests the October 2025 raise ($3.85M CAD) remains sufficient for this phase, reducing immediate dilution risk compared to a new equity raise.
PNTR · Price
Company Overview
  • Company: Pantera Silver Corp. (TSXV: PNTR).
  • Flagship Project: Rakanco Silver Project, Bolivia.
  • Location: Mejillates and Sabaya Provinces, Oruro Department, southwest Bolivia.
  • Project Size: 17,975 hectares across three concessions (Fahed, Rakan, Nada).
  • Geological Setting: Carangas district volcanic caldera complex; adjacent to the New Pacific Metals Carangas deposit (205.3 Moz Ag reported).
  • Status: Exploration phase; moving from remote sensing surveys to geophysical/IP surveys and drilling target definition.
  • Secondary Asset: Nuevo Taxco Project, Mexico was relinquished in March 2026 following a portfolio review.
Read the original news release →

More from Pantera Silver Corp.