Fury Files Technical Report for the Eau Claire Gold Project in Quebec
None

The most recent news release dated October 17, 2025, states that Fury Gold Mines Limited has filed its National Instrument 43-101 (NI 43-101) Technical Report for the Preliminary Economic Assessment (PEA) of the Eau Claire Gold Project in Quebec. This report supports the PEA results announced on September 2, 2025, which included a base case after-tax NPV (5%) of C$554 million and an after-tax IRR of 41% at a $2400/oz gold price. The report confirms the technical details, resource estimates, and economic assumptions.
This news is a routine regulatory filing following the announcement of the Preliminary Economic Assessment (PEA) results for the Eau Claire Gold Project on September 2, 2025. The PEA itself was a significant positive development, demonstrating robust economics for the project. The filing of the technical report simply formalizes and publicly documents the information previously disclosed, adhering to regulatory requirements. It does not introduce new material information that would alter the market's perception of the project or the company's valuation beyond what was already factored in from the initial PEA announcement. Therefore, while it completes a crucial step in the project's de-risking and regulatory compliance, its immediate impact on the stock price is neutral as it merely confirms prior expectations.
Fury Gold Mines Limited is a Canadian exploration company focused on advancing its portfolio of gold and critical mineral projects in Quebec and Nunavut.
Its flagship project is the Eau Claire Gold Project in the Eeyou Istchee James Bay region of Quebec. On September 2, 2025, a Preliminary Economic Assessment (PEA) was announced for Eau Claire, showing strong economics: * Base Case (Full standalone operation): After-tax NPV(5%) of C$554M and IRR of 41% (at $2400/oz Au). * Hybrid Case (2 years toll milling, then standalone): NPV C$610M, IRR 53%. * Toll Milling Case (Full toll milling): NPV C$639M, IRR 84%. * Life of Mine: 11 years, average annual production 76 koz gold, AISC $1140-$1170/oz. * Initial Capex: C$117M - C$217M. * Resources: 1.16 Moz gold (Measured and Indicated) at 5.64 g/t Au, and 723 koz gold (Inferred) at 4.13 g/t Au (May 10, 2024 MRE).
Other key projects include: * Sakami Gold Project (Quebec): Acquired through the Quebec Precious Metals Corp. acquisition. High-potential gold project with a 23km gold-bearing structural corridor. Drilling results in August and September 2025 indicated promising intercepts including high-grade silver. * Elmer East Project / Ninaaskumuwin Lithium Discovery (Quebec): Also acquired via QPM. Maiden drilling in July 2025 showed significant lithium intercepts (e.g., 32.35m of 1.16% Li2O). Metallurgical tests were encouraging. * Committee Bay Project (Nunavut): Hosts the Three Bluffs gold deposit (524k oz Indicated at 7.85 g/t Au, 720k oz Inferred at 7.64 g/t Au). Recent exploration identified drill-ready shear zone targets, and a 5,000m drill program commenced in July 2025. * Eleonore South Gold Project (Quebec): Acquired 100% ownership from Newmont. Drilling began in February 2025 targeting Eleonore-style anomalies. Initial results were low-grade, requiring future targeting.