Drill Results
Earthwise completes phase 1 fieldwork at Iron Range

WISE · Price
Executive Summary
- Earthwise Minerals Corp. has completed Phase 1 of its 2025 field program at the Iron Range gold project in British Columbia, conducted by TerraLogic Exploration Inc.
- The phase involved extensive sampling and mapping across four key target zones (Pyromorphite, Golden Cap, DIP, and Star West), including 538 soil samples and 15 rock samples.
- Analytical results are currently pending; however, the release provides significant historical context, including high-grade historical grab samples and past drilling intersections that justify the current exploration focus.
Key Details
- Phase 1 Field Program Completion:
- Sampling: 538 soil samples collected over 13.5 line km; 15 rock samples collected.
- Activities: Structural mapping and prospecting conducted across key target zones.
- Status: Samples submitted for analysis; results to be released once compiled and interpreted.
- Target Zone Details & Historical Data:
- Pyromorphite Zone:
- Discovered in 2009 via road construction exposing sheared/brecciated sediments.
- Historical grab sample SK10-207: 27.0 g/t Au, 173.0 g/t Ag, 13.4% Pb.
- Historical grab sample MK10-170: 54.7 g/t Au, 42.2 g/t Ag, 2.8% Pb.
- Golden Cap:
- 2025 sampling designed to test cross-fault intersections along the main Iron Range fault zone.
- Historical soil sampling by Eagle Plains returned values up to 230 ppb Au.
- DIP Zone:
- Soil sampling conducted over an area with a historical multielement soil geochemical anomaly previously unanalyzed for gold.
- Star West:
- Soil sampling conducted over an area with a historical multielement soil geochemical anomaly previously unanalyzed for gold.
- Pyromorphite Zone:
- Historic Drilling Context:
- Talon Zone (2010): Drill hole IR10-010 intersected:
- 14.0 m grading 5.1 g/t Au, 1.86% Pb, 2.1% Zn, 75.3 g/t Ag.
- 7.1 m grading 8.13 g/t Au, 2.84% Pb, 3.07% Zn, 86.6 g/t Ag.
- North of Talon (2008): Drill hole IR08006 intersected 7.0 m grading 51.52 g/t Au (1.50 oz/t).
- Talon Zone (2010): Drill hole IR10-010 intersected:
- Project Ownership & Terms:
- Earthwise holds an exclusive option to acquire up to an 80% interest in the Iron Range gold project.
- Project is 100% owned by Eagle Plains Resources Ltd.
- Subject to an underlying 1.0% Net Smelter Return (NSR) royalty.
- Project Infrastructure & Permitting:
- Located near Creston, B.C., covering 21,437 hectares (10 km x 32 km).
- Fully permitted under a multiyear area-based (MYAB) permit allowing geophysical surveys, trenching, trail construction, and diamond drilling.
- Access via well-developed transportation/power corridor (high-pressure gas pipeline, high-voltage hydroelectric line, CPR mainline, Highway 3).
- Efficient access to Teck’s smelter in Trail, B.C. via rail.
- Historical Exploration Summary (Since 2001):
- 21,593 m of diamond drilling in 87 holes.
- 2,482 line km of airborne and surface geophysical surveys.
- 10,053 soil geochemical samples.
- 495 rock samples.
- 6,955 drill core samples.
Notable Quotes
- No direct quotes from management or the CEO were included in the provided text.
More from Earthwise Minerals Corp
Jun 16, 2026 · 07:00