Northwire Canada EditionFriday, August 14, 2026
Northwire
NPK 0.870 +1.2% GRZ 6.26 −1.4% AVL 5.23 +3.0% TSLV 0.085 −5.6% MPVD 0.015 +0.0% DNG 6.61 +0.0% GLO 0.610 −4.7% CTGO 27.39 +0.5% SKE 45.73 −1.1% MTA 12.63 −0.7% VMET 14.15 +1.8% IMM 0.065 +0.0% LMCU 9.60 −1.9% EFF 0.025 −16.7% AYA 37.44 −4.2% MDM 0.060 +0.0% NPK 0.870 +1.2% GRZ 6.26 −1.4% AVL 5.23 +3.0% TSLV 0.085 −5.6% MPVD 0.015 +0.0% DNG 6.61 +0.0% GLO 0.610 −4.7% CTGO 27.39 +0.5% SKE 45.73 −1.1% MTA 12.63 −0.7% VMET 14.15 +1.8% IMM 0.065 +0.0% LMCU 9.60 −1.9% EFF 0.025 −16.7% AYA 37.44 −4.2% MDM 0.060 +0.0%
Drill Results

Star Copper begins phase 2 drilling at Star

STCU · Price

Executive Summary

  • Star Copper Corp. has commenced Phase 2 drilling at its 100%-owned Star project in British Columbia, with the first hole (S-056) intersecting significant mineralization including up to 240 metres of potassically altered rock and bornite.
  • Hole S-056 expanded the known mineralized corridor approximately 100 metres to the west of the previous hole (S-055), strengthening the west-southwest trend of near-surface oxides above hypogene sulphides.
  • The Copper Creek target, located southeast of Star Main, has reached an advanced state of readiness for drilling, with geological mapping identifying multiple chalcopyrite-mineralized outcrops and sulphide occurrences.

Key Details

  • Phase 2 Drilling Kickoff: The company initiated a proposed 4,000-metre exploration program at the Star project.
  • Hole S-056 Intersections:
    • Intersected up to 240 metres of potassically altered rock with small intergrown bornite (not previously seen in Star project samples).
    • Cut a broad, near-surface oxide-to-transitional profile (approximately 8 to 131 metres) with multiple faults and breccias; malachite noted on fractures locally to 50 metres depth.
    • Below 131 metres, the hole transitions into the hypogene domain exhibiting consistent potassic (potassium-feldspar) alteration, vein halos, and pervasive replacement.
    • Chalcopyrite occurs as fine disseminations and within quartz-pyrite-chalcopyrite veins and stockworks.
    • Broad, well-veined intervals identified from 284 to 413 metres, with minor pyrite plus or minus chalcopyrite continuing intermittently to the end of the hole.
  • Hole S-056 Specifications:
    • Collared approximately 100 metres west of S-055.
    • Drilled north at minus 75 degrees to a depth of 551 metres.
    • Situated on a drill pad where fieldwork uncovered significant copper-oxide mineralization (malachite, azurite, chrysocolla) in oxidized breccias.
  • Geological Impact:
    • S-056 expands the known mineralized corridor approximately 100 metres to the west.
    • Strengthens the west-southwest trend of near-surface oxides above hypogene sulphides in quartz monzodiorite.
    • Samples from S-056 are pending QA/QC review and will be reported once received.
  • Mineralogy Updates:
    • Identification of bornite (Cu5FeS4), a high-grade copper ore often found in supergene enrichment zones, in addition to chalcopyrite (CuFeS2).
    • The supergene zone at Star Main is noted as a relatively rare find for the region, suggesting valuable metals concentration near the surface.
  • Copper Creek Target Update:
    • Field crew has complete trail access from the Star camp.
    • Completed systematic geological traverse across the Copper Creek gully system, including ground-truthing historic drill sites (G1-70 and G2-70).
    • Mapping identified multiple chalcopyrite-mineralized outcrops within fractured volcaniclastic units and disseminated within quartz diorite dikes and sills.
    • Malachite and azurite staining observed on several outcrops west of historic collars.
    • Additional sulphide occurrences (pyrrhotite, sphalerite, galena) observed over roughly one kilometre of strike within the creek basin.
    • Main mineralized zone comprises a 3-4 metre wide, subvertical breccia with quartz-sulphide and vuggy quartz-chalcedony veining.
    • Includes several 5-25 centimetre lenses of semi-massive pyrite-chalcopyrite hosted in heavily fractured volcanics.
    • Interpretation and analysis of collected samples are underway to finalize drill-ready targets for Phase 2.

Notable Quotes

  • "Momentum is building. With hole S-056 confirming westward expansion at Star Main and Copper Creek advancing toward drill-ready status, phase 2 will focus on targeted stepouts, deeper tests along the W-SW trend and first-pass holes at Copper Creek to broaden discovery potential across the property. The entire team at Star Copper looks forward to sharing assay results and continued updates as phase 2 progresses." — Darryl Jones, Chief Executive Officer
Read the original news release →

More from Star Copper Corp