Northwire Canada EditionSaturday, November 14, 2026
Northwire
⌕
Gold 3,886.30 +0.0% Silver 49.12 −1.9% Copper 6.09 −1.7% Oil 88.56 −0.2% Palladium 1,007.60 +1.6% PPTA 25.29 −0.6% AIR 0.050 −9.1% PMX 0.055 +0.0% CCMC 0.340 +0.0% PPM 0.095 +0.0% BMR 0.165 +0.0% S 0.175 +0.0% STGO 1.37 −2.8% GRDM 0.180 +0.0% CRI 0.015 +0.0% CN 0.120 +0.0% BTT 0.100 −13.0% AUXX 5.07 −2.9% CLV 0.120 + VUL 0.360 −5.3% LUNR 15.66 −3.1% Gold 3,886.30 +0.0% Silver 49.12 −1.9% Copper 6.09 −1.7% Oil 88.56 −0.2% Palladium 1,007.60 +1.6% PPTA 25.29 −0.6% AIR 0.050 −9.1% PMX 0.055 +0.0% CCMC 0.340 +0.0% PPM 0.095 +0.0% BMR 0.165 +0.0% S 0.175 +0.0% STGO 1.37 −2.8% GRDM 0.180 +0.0% CRI 0.015 +0.0% CN 0.120 +0.0% BTT 0.100 −13.0% AUXX 5.07 −2.9% CLV 0.120 + VUL 0.360 −5.3% LUNR 15.66 −3.1%
Drill Results

Fathom Nickel granted winter trail access at Gochager

FNI · Price

Executive Summary

  • Fathom Nickel Inc. has secured winter trail access to its Gochager Lake project, utilizing the Roy-Lloyd mine access road and historic trails to facilitate exploration activities.
  • The company plans to conduct a low-frequency electromagnetic (EM) geophysical survey starting in early January 2026 to expand on previous geochemical findings east-northeast of the deposit.
  • Drilling is anticipated to begin by mid-February 2026, with the new access route significantly reducing exploration costs by eliminating the need for helicopter and fixed-wing air support.

Key Details

  • Access Logistics: Permission granted to use the access road to the Roy-Lloyd mine (currently under care and maintenance).
  • Trail Preparation Schedule:
    • Initial phase: Flag approved trail from Roy-Lloyd mine to Benjamin Lake; aim to complete trail to Benjamin Lake by Christmas.
    • Post-holiday phase: Prepare existing historic trails between Benjamin and Bellows Lake.
    • Ice Roads: Utilize ice roads on Benjamin Lake and Bellows Lake, subject to ice suitability.
  • Drilling Timeline: Transportation of drilling equipment to the project is scheduled for mid-February 2026. The company is currently arranging a drill contractor.
  • Geophysical Survey:
    • Start Date: Early January 2026.
    • Method: Low-frequency EM survey along strike of the historic Gochager Lake deposit.
    • Objective: Continuation of previous EM surveys over the expanded Ni-Cu-Co geochemical footprint east-northeast of the deposit.
  • Cost Synergies: The combination of road access, ice roads, and historic trails eliminates dependency on helicopter transport and dramatically reduces winter fixed-wing air support, allowing for more meters to be drilled at a lower all-in cost.
  • Qualified Person: Ian Fraser, PGeo, CEO and VP of Exploration, has verified the technical data.

Notable Quotes

  • "The winter trail into the Gochager Lake project is an important milestone for the company, providing synergies that will significantly reduce our all-in cost of exploration. The combination of permissions to access the Roy-Lloyd mine property from Highway 102, utilizing ice roads and historic trails overland will eliminate dependency on helicopter and dramatically reduce winter fixed-wing air support. This all leads to the ability to drill more meters at the project." — Ian Fraser, CEO and VP of Exploration
Read the original news release →

More from Fathom Nickel Inc