Northwire Canada EditionThursday, August 6, 2026
Northwire
RME 0.175 +0.0% INTR 0.770 −3.8% PNTR 0.430 −4.4% COPR 0.350 +0.0% YGT 0.180 +0.0% ARIC 0.880 +6.0% LUCA 0.920 −3.2% IVN 11.39 −0.3% HHH 4.30 +9.1% FMN 0.255 −3.8% OMM 0.060 +20.0% DYG 0.130 +0.0% GTC 0.710 +0.0% DLTA 0.175 −2.8% GOFL 0.025 +0.0% NVX 0.340 +70.0% RME 0.175 +0.0% INTR 0.770 −3.8% PNTR 0.430 −4.4% COPR 0.350 +0.0% YGT 0.180 +0.0% ARIC 0.880 +6.0% LUCA 0.920 −3.2% IVN 11.39 −0.3% HHH 4.30 +9.1% FMN 0.255 −3.8% OMM 0.060 +20.0% DYG 0.130 +0.0% GTC 0.710 +0.0% DLTA 0.175 −2.8% GOFL 0.025 +0.0% NVX 0.340 +70.0%
Drill Results

Fathom Nickel granted winter trail access at Gochager

FNI · Price

Executive Summary

  • Fathom Nickel Inc. has secured winter trail access to its Gochager Lake project, utilizing the Roy-Lloyd mine access road and historic trails to facilitate exploration activities.
  • The company plans to conduct a low-frequency electromagnetic (EM) geophysical survey starting in early January 2026 to expand on previous geochemical findings east-northeast of the deposit.
  • Drilling is anticipated to begin by mid-February 2026, with the new access route significantly reducing exploration costs by eliminating the need for helicopter and fixed-wing air support.

Key Details

  • Access Logistics: Permission granted to use the access road to the Roy-Lloyd mine (currently under care and maintenance).
  • Trail Preparation Schedule:
    • Initial phase: Flag approved trail from Roy-Lloyd mine to Benjamin Lake; aim to complete trail to Benjamin Lake by Christmas.
    • Post-holiday phase: Prepare existing historic trails between Benjamin and Bellows Lake.
    • Ice Roads: Utilize ice roads on Benjamin Lake and Bellows Lake, subject to ice suitability.
  • Drilling Timeline: Transportation of drilling equipment to the project is scheduled for mid-February 2026. The company is currently arranging a drill contractor.
  • Geophysical Survey:
    • Start Date: Early January 2026.
    • Method: Low-frequency EM survey along strike of the historic Gochager Lake deposit.
    • Objective: Continuation of previous EM surveys over the expanded Ni-Cu-Co geochemical footprint east-northeast of the deposit.
  • Cost Synergies: The combination of road access, ice roads, and historic trails eliminates dependency on helicopter transport and dramatically reduces winter fixed-wing air support, allowing for more meters to be drilled at a lower all-in cost.
  • Qualified Person: Ian Fraser, PGeo, CEO and VP of Exploration, has verified the technical data.

Notable Quotes

  • "The winter trail into the Gochager Lake project is an important milestone for the company, providing synergies that will significantly reduce our all-in cost of exploration. The combination of permissions to access the Roy-Lloyd mine property from Highway 102, utilizing ice roads and historic trails overland will eliminate dependency on helicopter and dramatically reduce winter fixed-wing air support. This all leads to the ability to drill more meters at the project." — Ian Fraser, CEO and VP of Exploration
Read the original news release →

More from Fathom Nickel Inc