Northwire Canada EditionTuesday, November 10, 2026
Northwire
⌕
Gold 4,038.70 −1.8% Silver 51.49 −2.3% Copper 6.27 −1.1% Oil 86.40 −0.5% Palladium 1,024.50 +0.3% PUR 0.370 +8.8% SCY 0.085 +6.2% AUMN 0.300 +7.1% SLG 6.24 −0.9% MSC 0.020 +0.0% MCI 0.140 +0.0% PPM 0.095 +0.0% SMP 0.045 −10.0% FUSE 0.020 −20.0% COPR 0.380 +1.3% WSK 0.170 +0.0% GAL 0.372 −2.0% VCG 1.07 +4.9% LVX 0.235 −30.9% RAMP 0.250 −7.4% QTWO 1.73 +7.5% Gold 4,038.70 −1.8% Silver 51.49 −2.3% Copper 6.27 −1.1% Oil 86.40 −0.5% Palladium 1,024.50 +0.3% PUR 0.370 +8.8% SCY 0.085 +6.2% AUMN 0.300 +7.1% SLG 6.24 −0.9% MSC 0.020 +0.0% MCI 0.140 +0.0% PPM 0.095 +0.0% SMP 0.045 −10.0% FUSE 0.020 −20.0% COPR 0.380 +1.3% WSK 0.170 +0.0% GAL 0.372 −2.0% VCG 1.07 +4.9% LVX 0.235 −30.9% RAMP 0.250 −7.4% QTWO 1.73 +7.5%
M&A / Property

Eureka Lithium completes acquisition of Stairway Mining

ERKA · Price

Executive Summary

  • Eureka Lithium Corp. has completed the acquisition of Stairway Mining Inc., securing 100% interests in the polymetallic Cabin Lake project (British Columbia) and the titanium-vanadium Tyee project (Quebec).
  • The transaction consideration consists of 9.1 million common shares of Eureka and potential milestone cash payments of up to $1 million, contingent on specific technical reporting and resource disclosure milestones.
  • The acquisition expands Eureka’s portfolio beyond lithium into polymetallic and critical mineral assets, leveraging assets with historical showings and proximity to major infrastructure.

Key Details

  • Transaction Structure: Acquisition of all issued and outstanding shares of Stairway Mining Inc. pursuant to an amended and restated share purchase agreement dated Feb. 20, 2026.
  • Equity Consideration: Eureka issued an aggregate of 9.1 million common shares to Stairway shareholders on a pro rata basis.
    • Hold Period: The consideration shares are subject to a hold period of four months and one day from the date of issuance.
    • Change from Original Terms: The original consideration was 12 million shares with no cash component; this was amended due to Canadian Securities Exchange policies regarding the hold period.
  • Milestone Cash Payments: Eureka agreed to pay up to $1 million in aggregate cash to former Stairway shareholders if the following milestones are met:
    1. Filing of technical reports for both properties on SEDAR+ within six months of the SPA date.
    2. Public disclosure of a mineral resource estimate for at least one property within nine months of the SPA date.
    3. Public disclosure of a preliminary economic assessment for at least one property within 15 months of the SPA date.
  • Cabin Lake Project (British Columbia):
    • Location: Omineca mining district, central BC.
    • Size: Six contiguous mineral claims totaling approximately 2,363 hectares.
    • Commodities: Polymetallic system prospective for zinc, lead, copper, molybdenum, and silver.
    • Status: Multiple historical showings; 600m x 1,000m target footprint identified.
    • Infrastructure: Located near established infrastructure and producing mines, including Endako and Blackwater mines.
  • Tyee Project (Quebec):
    • Location: Havre-St-Pierre region, Quebec (Havre-St-Pierre Anorthosite complex).
    • Size: 189 contiguous mineral claims covering approximately 10,136 hectares.
    • Commodities: Titanium and vanadium.
    • Targets: Big TiO, NS trend, and East Nugget targets.
    • Context: Region hosts the world-class Lac Tio mine; historical geophysical surveys and surface sampling conducted.
  • Valuation Basis: Consideration determined through arm's-length negotiations based on independent assessment of exploration potential, geological merit, strategic value, and market comparables, not historical staking costs.
  • Counterparties: Former Stairway shareholders are arm's length to Eureka, its directors, officers, and insiders.

Notable Quotes

  • "The acquisition of the Cabin Lake and Tyee projects represents a strategic expansion of Eureka's asset base beyond lithium and into high-conviction polymetallic and titanium-vanadium prospective projects," stated Dave Bowen, chief executive officer of Eureka Lithium. "Both projects are located in mining-friendly jurisdictions with strong infrastructure and district-scale geological potential. These projects give Eureka exposure to mineral projects targeting exploration for important materials necessary for defence, electrification and advanced manufacturing."
Read the original news release →

More from Eureka Lithium Corp