Northwire Canada EditionThursday, July 30, 2026
Northwire
ZAC 0.060 +0.0% ELE 21.18 −1.7% GHRT 0.750 +0.0% AEM 203.13 +0.1% JTWO 0.135 +0.0% EDR 10.63 −2.8% VMXX 0.750 +5.6% K 32.71 −1.5% AGI 40.13 −1.4% VGZ 2.40 +0.8% CAN 0.055 +0.0% NVO 0.055 +0.0% ARIS 19.57 −4.2% IVN 10.59 −0.8% MCI 0.165 +0.0% MTS 0.130 +0.0% ZAC 0.060 +0.0% ELE 21.18 −1.7% GHRT 0.750 +0.0% AEM 203.13 +0.1% JTWO 0.135 +0.0% EDR 10.63 −2.8% VMXX 0.750 +5.6% K 32.71 −1.5% AGI 40.13 −1.4% VGZ 2.40 +0.8% CAN 0.055 +0.0% NVO 0.055 +0.0% ARIS 19.57 −4.2% IVN 10.59 −0.8% MCI 0.165 +0.0% MTS 0.130 +0.0%
Drill Results

Bullion Gold receives drill permits for Langlade

BGD · Price

Executive Summary

  • Bullion Gold Resources Corp. has secured drilling permits from the Quebec Ministry of Natural Resources and Forests for its Langlade volcanogenic massive sulphide (VMS) project.
  • The company will launch a minimum 1,500m drilling program in the coming weeks to target structural extensions, infill historical gaps, and verify gold/silver potential in untested zones.
  • A helicopter-borne mag-VTEM geophysical survey will be conducted to unify historical data and refine priority targets, with results expected before drilling begins.

Key Details

  • Permit approval received from the Quebec Ministry of Natural Resources and Forests for the Langlade project drilling program.
  • Project focus: Polymetallic VMS targeting copper, zinc, and silver, with noted gold potential.
  • Historical mineralization extent: Traced over approximately 1,200 metres laterally and up to 900 metres vertically.
  • Planned drilling scope: Minimum 1,500 metres targeting structural extensions of the deposit and infilling untested historical gaps between existing drill holes.
  • Target areas: North-northeast limb of the main fold structure, plus new exploration targets to the north and east focusing on untested geophysical and geochemical anomalies with gold grain indications.
  • Geophysical survey: Helicopter-borne mag-VTEM survey planned to unify historical east-west data, bridge survey gaps, and refine magnetic/conductive anomalies to improve structural understanding and targeting.
  • Schedule: Drilling program to commence within the next few weeks; geophysical survey results expected prior to drilling initiation.
  • Geological model: Mineralization associated with semi-massive to massive sulphide horizons at the contact between mafic and felsic volcanic units, potentially controlled by a large-scale fold structure that may host additional lateral and structural extensions.
Read the original news release →

More from Bullion Gold Resources Corp.