Northwire Canada EditionSunday, August 30, 2026
Northwire
GOLD 4529.90 −2.9% SILVER 67.79 −3.5% COPPER 6.66 −0.5% OIL 83.40 −0.2% PALLADIUM 1428.60 +5.4% SAE 0.520 +4.0% ZEN 0.770 +0.0% WGLD 0.130 +13.0% AEM 286.76 −3.9% SAG 1.32 −4.3% GSVR 0.475 −5.0% CRI 0.050 −9.1% TMQ 5.04 −4.2% BTO 7.85 −3.0% HBM 40.78 −3.0% EFR 20.38 −6.5% SF 0.365 −4.0% SPX 0.115 +0.0% CQR 0.060 +20.0% IVS 0.310 +5.1% CNC 1.44 −2.7% GOLD 4529.90 −2.9% SILVER 67.79 −3.5% COPPER 6.66 −0.5% OIL 83.40 −0.2% PALLADIUM 1428.60 +5.4% SAE 0.520 +4.0% ZEN 0.770 +0.0% WGLD 0.130 +13.0% AEM 286.76 −3.9% SAG 1.32 −4.3% GSVR 0.475 −5.0% CRI 0.050 −9.1% TMQ 5.04 −4.2% BTO 7.85 −3.0% HBM 40.78 −3.0% EFR 20.38 −6.5% SF 0.365 −4.0% SPX 0.115 +0.0% CQR 0.060 +20.0% IVS 0.310 +5.1% CNC 1.44 −2.7%
Resource Estimate

Copper Giant Announces Filing of Technical Report for the Mocoa Project containing Updated Mineral Resource Estimate

LBC · Price

Executive Summary

  • Copper Giant filed an NI 43‑101 technical report announcing an updated inferred mineral resource of 12.7 billion lbs CuEq at 0.51% CuEq, representing a +76 % increase in tonnage, +14 % higher grade, and +101 % more contained metal versus the prior estimate.
  • The resource comprises 7.6 billion lbs copper (0.31% Cu) and 1.0 billion lbs molybdenum (0.039% Mo) within 1.12 billion tonnes, constrained by a pit‑shell cut‑off of 0.25 % CuEq using $4.00/lb Cu and $20.00/lb Mo pricing.
  • The estimate was prepared by independent Qualified Persons from APEX Geoscience; the system remains open laterally and at depth with multiple nearby untested porphyry targets, supporting further upside potential.

Key Details

  • Effective date of Technical Report: 23 Dec 2025 (effective 18 Nov 2025).
  • Resource classification: Inferred mineral resources only; no reserves disclosed.
  • Cut‑off grades & corresponding tonnage/grade/contained metal:
Cut‑off % CuEq Tonnage (Mt) CuEq (%) Cu (%) Mo (%) Contained CuEq (Blbs) Contained Cu (Blbs) Contained Mo (Blbs)
0.10 1,553 0.42 0.25 0.031 14.4 8.7 1.1
0.15 1,410 0.45 0.27 0.034 14.0 8.4 1.0
0.20 1,268 0.48 0.29 0.036 13.4 8.1 1.0
0.25 (primary) 1,120 0.51 0.31 0.039 12.7 7.6 1.0
0.30 972 0.55 0.33 0.042 11.8 7.0 0.9
0.40 674 0.64 0.38 0.050 9.5 5.6 0.7
0.50 441 0.74 0.43 0.059 7.2 4.2 0.6
0.60 287 0.84 0.48 0.068 5.3 3.1 0.4
0.70 190 0.94 0.53 0.077 3.9 2.2 0.3
  • Economic assumptions used:
  • Cu price = US$4.00/lb, Mo price = US$20.00/lb
  • Process recoveries: 90 % Cu, 95 % Mo
  • Processing cost = US$10/t, G&A = US$1/t, NSR royalty = 3 %

  • Pit‑shell parameters: US$2.5/t mining cost (mineralized & waste), 45° slopes; pit‑constrained resources reported at 0.25 % CuEq cut‑off.

  • Qualified Persons: Kevin Hon, B.Sc., P.Geo.; Warren Black, M.Sc., P.Geo. (APEX) – independent QPs; peer review by Michael Dufresne, M.Sc., P.Geo., President & CEO of APEX. Edwin Naranjo Sierra, VP Exploration (Copper Giant) acted as company QP for the release.

  • QA/QC: No material QA/QC issues identified; core sampling, assay protocols, and data validation procedures described in detail.

  • Project context: Mocoa lies in Colombia’s Putumayo Dept., covering >132,500 ha of district‑scale tenure within a Jurassic porphyry belt; the system is open in all directions with multiple satellite targets, indicating potential for further resource expansion.

Notable Quotes

(No direct CEO/President quotes were included in the release.)

Read the original news release →

More from Libero Copper & Gold Corporation