Northwire Canada EditionMonday, September 14, 2026
Northwire
GOLD 4408.90 +0.0% SILVER 65.19 +0.4% COPPER 6.55 +0.0% OIL 100.05 −2.4% PALLADIUM 1323.90 +2.3% PGZ 0.170 +3.0% TMQ 4.55 −1.3% SLI 3.08 −1.0% ROX 0.050 −9.1% USHA 0.045 +0.0% ALGR 0.710 +2.9% MINE 0.120 −4.0% KC 0.330 +4.8% EMO 0.335 +0.0% CCM 0.700 +4.5% MAI 5.97 −0.7% PPM 0.015 +0.0% CRE 0.370 +10.4% MNO 1.87 +0.5% FEO 0.810 +3.9% LBNK 0.680 −4.2% GOLD 4408.90 +0.0% SILVER 65.19 +0.4% COPPER 6.55 +0.0% OIL 100.05 −2.4% PALLADIUM 1323.90 +2.3% PGZ 0.170 +3.0% TMQ 4.55 −1.3% SLI 3.08 −1.0% ROX 0.050 −9.1% USHA 0.045 +0.0% ALGR 0.710 +2.9% MINE 0.120 −4.0% KC 0.330 +4.8% EMO 0.335 +0.0% CCM 0.700 +4.5% MAI 5.97 −0.7% PPM 0.015 +0.0% CRE 0.370 +10.4% MNO 1.87 +0.5% FEO 0.810 +3.9% LBNK 0.680 −4.2%
Production / Operations Routine +

Artemis Gold Announces Q1 2026 Production Results

Operational Resilience Validates Cash-Flow Expansion Thesis Despite Mill Downtime

Executive Summary
  • Artemis Gold reported Q1 2026 gold production of 61,923 oz from the Blackwater Mine.
  • Full-year 2026 production guidance remains unchanged at 265,000–290,000 oz despite a 7-day unplanned mill shutdown in March.
  • Mill recovery reached a record 90.6%, up from 88.1% in Q4 2025.
  • Management reaffirmed confidence in funding Phase 1A and Expanded Phase 2 expansions from operating cash flow, targeting >500,000 oz annual production by end-2028.
  • The company plans to announce Q1 financial results on May 6, 2026.
Material Impact
  • Guidance Validation: Maintaining full-year guidance after a significant operational disruption (gearbox failure) confirms management's ability to mitigate downtime risks and meet targets.
  • Operational Efficiency: Record mill recovery of 90.6% offsets the throughput loss from the shutdown, demonstrating technical optimization progress.
  • Financial Discipline: Reiteration that expansions are funded by operating cash flow reduces dilution risk for shareholders, supporting the valuation thesis established in Q4 2025 and Jan 2026 financing news.
  • Market Expectation: The guidance maintenance was already communicated during the March shutdown announcement; therefore, this release is a confirmation rather than new information, limiting immediate upside surprise.
ARTG · Price
Company Overview
  • Company: Artemis Gold Inc., focused on the Blackwater Mine in British Columbia, Canada.
  • Flagship Project: Blackwater Mine is a fully integrated open-pit gold mine with processing capacity currently ramping up to 17,700 t/d (107% of design).
  • Expansion Strategy:
    • Phase 1A: Increase capacity to 8 Mtpa by Q4 2026 ($95–$100M capex).
    • Expanded Phase 2 (EP2): Target >500,000 oz/yr by end-2028 with 21 Mtpa throughput ($1.44B total cost).
  • Resource Base: Measured & Indicated resources of 11.7 Moz Au and 122.4 Moz Ag as of May 2025.
Read the original news release →

More from Artemis Gold Inc.