Northwire Canada EditionSunday, November 29, 2026
Northwire
⌕
Gold 3,668.50 +3.8% Silver 43.70 +9.1% Copper 5.52 +3.4% Oil 83.33 −0.4% Palladium 879.00 +5.5% MUN 0.285 +11.8% RNCH 0.030 +0.0% GSKR 2.30 +8.0% ADY 0.370 +5.7% TSK 0.640 +1.6% BAY 0.055 +22.2% CGNT 0.670 −2.9% INFI 0.190 +0.0% GSS 0.045 +50.0% HAY 0.040 +0.0% WRLG 0.430 +1.2% MPVD 0.015 + GGO 0.980 +5.4% NAU 0.530 +6.0% COCO 0.260 +8.3% TBLL 0.045 +12.5% Gold 3,668.50 +3.8% Silver 43.70 +9.1% Copper 5.52 +3.4% Oil 83.33 −0.4% Palladium 879.00 +5.5% MUN 0.285 +11.8% RNCH 0.030 +0.0% GSKR 2.30 +8.0% ADY 0.370 +5.7% TSK 0.640 +1.6% BAY 0.055 +22.2% CGNT 0.670 −2.9% INFI 0.190 +0.0% GSS 0.045 +50.0% HAY 0.040 +0.0% WRLG 0.430 +1.2% MPVD 0.015 + GGO 0.980 +5.4% NAU 0.530 +6.0% COCO 0.260 +8.3% TBLL 0.045 +12.5%
Technical Study Routine +

Noram awaits Zeus assay results, begins met testing

Noram advances Zeus metallurgical testing as rubidium potential delays the preliminary economic assessment release.

Executive Summary

Noram Lithium Corp. (NRM) released a technical update on November 25, 2026, confirming the continuation of its expanded metallurgical program at the Zeus project in Nevada. The program focuses on lithium recovery optimization and the evaluation of high-value by-products, specifically rubidium, potassium, and cesium. Initial assay results have been received, with additional laboratory results and metallurgical testing currently underway. Preliminary indications suggest that rubidium recovery could be material to the project's economics.

The company is working toward an updated mineral resource estimate (MRE) and a revised preliminary economic assessment (PEA). A draft technical report and economic model are in progress. This release follows a November 5, 2026 update that cited delays in the PEA due to extended laboratory assay turnaround times. The current release confirms the delay is ongoing as met testing begins and draft economic modeling continues.

Noram Lithium is actively searching for a new Chief Executive Officer and will update shareholders upon appointment.

Material Impact

Noram Lithium Corp. (NRM) released a technical progress update regarding the Zeus project that aligns with the previously communicated timeline and scope for its metallurgical and economic studies. The company continues to compile data and model results, as indicated by the draft status of the technical report. This phase does not materially alter the near-term risk profile or capital requirements.

The update mentions preliminary rubidium potential, though this remains speculative until full metallurgical recovery rates and economic credits are quantified in the final Preliminary Economic Assessment (PEA). The release of the PEA has been delayed, a situation first flagged on November 5, with no new catalyst or accelerated timeline introduced. The incremental nature of this update, combined with the absence of a finalized economic model or resource estimate, limits immediate price discovery, as the market has already priced in the technical study timeline and associated delays.

NRM · Price
Company Overview

Noram Lithium Corp. (NRM) is a pre-revenue exploration-stage company focused on the Zeus Critical Minerals Project, located in Clayton Valley, Nevada, on BLM-administered federal land in Esmeralda County. The company holds a 100% interest in the project, subject to a 1.0% gross overriding revenue royalty. The land position comprises approximately 2,800 acres, including 146 placer and 136 lode claims.

The project is currently in the exploration and pre-development stage. Seven drilling phases have been completed, totaling 92 holes and 7,777 meters. A May 2024 SRK Consulting NI 43-101 estimate reports a resource base of 586 Mt Indicated @ 957 ppm Li (2.987 Mt contained LCE) and 300 Mt Inferred @ 861 ppm Li. The project is also being evaluated for the recovery of rubidium, cesium, potassium, and molybdenum alongside lithium.

Read the original news release →

More from Noram Lithium Corp.