Northwire Canada EditionSunday, November 29, 2026
Northwire
⌕
Gold 3,668.50 +3.8% Silver 43.70 +9.1% Copper 5.52 +3.4% Oil 83.33 −0.4% Palladium 879.00 +5.5% MUN 0.285 +11.8% RNCH 0.030 +0.0% GSKR 2.30 +8.0% ADY 0.370 +5.7% TSK 0.640 +1.6% BAY 0.055 +22.2% CGNT 0.670 −2.9% INFI 0.190 +0.0% GSS 0.045 +50.0% HAY 0.040 +0.0% WRLG 0.430 +1.2% MPVD 0.015 + GGO 0.980 +5.4% NAU 0.530 +6.0% COCO 0.260 +8.3% TBLL 0.045 +12.5% Gold 3,668.50 +3.8% Silver 43.70 +9.1% Copper 5.52 +3.4% Oil 83.33 −0.4% Palladium 879.00 +5.5% MUN 0.285 +11.8% RNCH 0.030 +0.0% GSKR 2.30 +8.0% ADY 0.370 +5.7% TSK 0.640 +1.6% BAY 0.055 +22.2% CGNT 0.670 −2.9% INFI 0.190 +0.0% GSS 0.045 +50.0% HAY 0.040 +0.0% WRLG 0.430 +1.2% MPVD 0.015 + GGO 0.980 +5.4% NAU 0.530 +6.0% COCO 0.260 +8.3% TBLL 0.045 +12.5%
Resource Estimate Routine +

Osisko Metals Announces Mineral Resource Update at Gaspe Copper

Osisko expands the base-case resource at its Gaspé project to 2.15 billion tonnes at 0.30% copper equivalent.

Executive Summary

Osisko Metals Incorporated (OM) has released an updated Mineral Resource Estimate for its Gaspé Copper Project in Eastern Quebec, marking a significant expansion of the deposit's known resources. The company reported that the Measured and Indicated resource base has grown to 2.15 billion tonnes, grading 0.25% copper and 0.30% copper equivalent. This update utilizes a lower cut-off grade of 0.12% CuEq. Additionally, the Inferred resource category has increased to 971 million tonnes at 0.60% CuEq.

The revised estimate incorporates a preliminary resource for the underground Porphyry Mountain deposit, which contains 706 million tonnes at 0.66% CuEq, while also expanding the open-pit base case. To support these calculations, Osisko Metals has adopted new economic parameters, assuming copper prices at $5.00 per pound, molybdenum at $20.00 per pound, and silver at $45.00 per ounce.

Looking ahead, the company is currently assaying results from a 70,000-meter drill program, with data expected to be available by mid-January 2027. This is followed by a planned 50,000-meter drilling program in the second quarter of 2027, which is intended to further upgrade the resource estimates.

Material Impact

Osisko Metals Incorporated (OM) has released an updated Mineral Resource Estimate (MRE) that reflects expected resource growth consistent with the company’s stated exploration strategy and previously announced economic parameters. The expansion is primarily driven by a reduction in the cut-off grade to 0.12% from the previous 0.16%, alongside higher copper price assumptions, rather than the discovery of a new high-grade zone.

The update incorporates the Porphyry Mountain underground resource, adding depth to the deposit model. This resource remains classified as Inferred, requiring further drilling to upgrade its classification. The release confirms that the company is on track with its drilling timeline and validates the economic potential under current market conditions. Given that the parameters and drilling campaign were previously disclosed, the news serves as an incremental follow-up rather than a sudden valuation catalyst.

OM · Price
Company Overview

Osisko Metals Incorporated (OM) is a copper development company centered on the Gaspé Copper Project in Eastern Quebec, a jurisdiction rated Tier 1 by the Fraser Institute. The flagship Gaspé Copper Project is a brownfield site featuring existing infrastructure, historical mining activity, and a large porphyry copper/skarn system. The company also holds the Marban gold project, which is located near Canadian Malartic, and the Pine Point zinc project, which is held in joint venture with Appian Capital. The recent spin-off of Osisko Copper Mining Corp (OCMC) separates non-core New Brunswick assets, allowing management to concentrate capital and focus on the Gaspé project.

Read the original news release →

More from Osisko Metals Incorporated