Drill Results
Talisker drills 0.5 m of 220 g/t Au at Mustang

TSK · Price
Executive Summary
- Talisker Resources reports high‑grade gold assay results from lateral development on the 1,060 m level of the Mustang underground mine.
- The Alhambra vein continues to deliver strong grades, with a standout intercept of 220 g/t Au over 0.50 m (including 40.44 g/t Au over 2.76 m).
- Additional results from the 1,120 m level are expected before month‑end, supporting ongoing underground production plans.
Key Details
- Sample X000816 – West Face No. 8: 220.0 g/t Au over 0.50 m; includes 40.44 g/t Au over 2.76 m.
- Sample X000443 – West Face No. 2: 43.3 g/t Au over 0.85 m; includes 13.0 g/t Au over 2.93 m.
- Sample X000507 – West Face No. 4: 37.0 g/t Au over 0.85 m; includes 11.0 g/t Au over 2.86 m.
- Sample X000457 – West Face No. 3: 19.7 g/t Au over 0.66 m; includes 5.6 g/t Au over 2.40 m.
-
Sample X000316 – West Face No. 1: 12.55 g/t Au over 0.74 m; includes 5.05 g/t Au over 2.54 m.
-
The results follow previous releases for the 1,075 m and 1,105 m levels, confirming consistent high‑grade mineralization down to 1,060 m.
- CEO Terry Harbort notes that production stope work above these samples (up to the 1,075 m level) is underway and expects face‑sampling results from the 1,120 m level before the end of March.
Qualified Person
- Leonardo de Souza (BSc, AusIMM CP #224827), Vice‑President Exploration & Resource Development, has approved the technical information per NI 43‑101 standards.
Notable Quotes
“The Alhambra vein continues to deliver consistent high‑grade results now extending down to the 1,060 level… we are excited to complete the extraction of this material.” – Terry Harbort, CEO, Talisker Resources Ltd.
More from Talisker Resources Ltd.
Jul 21, 2026 · 07:00