- Talisker Resources released preliminary results from the second phase of laser‑based ore‑sorting tests on Bralorne gold project material, demonstrating high recoveries (95 %–99 %) and significant waste rejection (35 %–55 %).
- Full‑scale testing processed 371.3 kg at Tomra’s Wedel facility using the PRO Secondary LASER Dual Device, confirming the sorter’s ability to concentrate quartz vein material into high‑grade fractions.
- Results support fast‑tracking design, permitting and construction phases for underground production at Mustang Mine.
Key Details
- First‑phase benchmark: Average feed grade 14.4 g/t Au → sorted product grade 27.8 g/t Au.
- Second‑phase testing: 371.3 kg of run‑of‑mine material processed at Tomra’s test centre (Wedel, Germany) with multichannel laser‑sorting technology (PRO Secondary LASER Dual Device).
- Waste rejection: Between 35 % and 55 % of total rock mass rejected as waste.
- Gold recoveries: Achieved between 95 % and 99 % across test runs, indicating excellent suitability of Bralorne vein material for laser‑based sorting.
- Cascading procedure: Three sequential sorting settings (1–3) evaluated; setting 1 gave highest recovery with lower product grade, while setting 3 delivered the highest product grade but slightly reduced recovery.
- Assay plan: Post‑test samples sent for fire‑assay gold analysis and multi‑element ICP‑MS digestion; concentrated material to undergo further mineral processing and metallurgical testwork.
- Management comment: CEO Terry Harbort expressed confidence in the sorter’s performance and indicated plans to accelerate design, permitting and construction activities pending assay results.
Notable Quotes
“We are impressed with these results using our run of mine material and full‑scale equipment… As we await the corresponding assay results for each fraction, we will be fast‑tracking to the design, permitting and construction phases.” – Terry Harbort, CEO, Talisker Resources Ltd.