Northwire Canada EditionSunday, November 29, 2026
Northwire
⌕
Gold 3,668.50 +3.8% Silver 43.70 +9.1% Copper 5.52 +3.4% Oil 83.33 −0.4% Palladium 879.00 +5.5% MUN 0.285 +11.8% RNCH 0.030 +0.0% GSKR 2.30 +8.0% ADY 0.370 +5.7% TSK 0.640 +1.6% BAY 0.055 +22.2% CGNT 0.670 −2.9% INFI 0.190 +0.0% GSS 0.045 +50.0% HAY 0.040 +0.0% WRLG 0.430 +1.2% MPVD 0.015 + GGO 0.980 +5.4% NAU 0.530 +6.0% COCO 0.260 +8.3% TBLL 0.045 +12.5% Gold 3,668.50 +3.8% Silver 43.70 +9.1% Copper 5.52 +3.4% Oil 83.33 −0.4% Palladium 879.00 +5.5% MUN 0.285 +11.8% RNCH 0.030 +0.0% GSKR 2.30 +8.0% ADY 0.370 +5.7% TSK 0.640 +1.6% BAY 0.055 +22.2% CGNT 0.670 −2.9% INFI 0.190 +0.0% GSS 0.045 +50.0% HAY 0.040 +0.0% WRLG 0.430 +1.2% MPVD 0.015 + GGO 0.980 +5.4% NAU 0.530 +6.0% COCO 0.260 +8.3% TBLL 0.045 +12.5%
Drill Results Routine +

NexMetals Reports New Third Zone at Selebi Main Returning 6.30 Metres of 2.67% Cu and 1.85% Ni in SMD-26-217

NexMetals reports high-grade intersections in the Third Zone, yet investor focus remains on the company’s ongoing funding requirements.

Executive Summary

NexMetals Mining Corp. (NEXM) has released assay results for two surface drill holes at the Selebi Main project: SMD-26-217 and SMD-26-216-W1. The company states that SMD-26-217 intersected three distinct zones, extending the interpreted high-grade trend approximately 100 meters toward Selebi North, to a distance of about 1.5 kilometers.

SMD-26-217 identified the following intercepts:

  • Main Zone: 3.15 m from 1,931.85 m at 3.14% Cu, 0.86% Ni, 0.04% Co; estimated true thickness 3.11 m; includes 1.95 m at 3.36% Cu, 1.28% Ni.
  • Lower Zone: 6.60 m from 1,974.75 m at 1.35% Cu, 1.95% Ni, 0.06% Co; true thickness 6.52 m; includes 4.25 m at 1.33% Cu, 2.37% Ni, 0.11% Co.
  • Third Zone: 6.30 m from 1,994.60 m at 2.67% Cu, 1.85% Ni, 0.09% Co; true thickness 6.22 m; includes 4.30 m at 2.98% Cu, 2.38% Ni, 0.11% Co. This zone is located below the Lower Zone.

SMD-26-216-W1 yielded the following results:

  • Main Zone: 1.00 m from 1,624.10 m at 2.98% Cu, 1.07% Ni; true thickness 0.99 m.
  • Lower Zone: 3.45 m from 1,683.35 m at 2.86% Cu, 1.52% Ni; true thickness 3.40 m; includes 1.45 m at 3.61% Cu, 1.94% Ni.

NexMetals describes SMD-26-216-W1 as an infill hole located approximately 165 meters north of the high-grade trend, noting that the results support lateral continuity. The release references the Selebi Main 2026 Inferred resource estimate of 32.47 Mt at 1.53% Cu, 0.97% Ni, and states that BHEM indicates potential for mineralization laterally and down plunge. No cutoff grade is stated for the drill intervals, and no CuEq is reported in this release. QA/QC and QP disclosures are included in the full report.

Material Impact

NexMetals Mining Corp. (NEXM) released assay results from the Third Zone, located below the Lower Zone, marking the first time grades have been confirmed for this intercept. The results include 6.30 meters at 2.67% copper and 1.85% nickel, with a true width of 6.22 meters. This data provides a positive update to the geological model and establishes a new target for follow-up drilling.

The Third Zone was previously identified as a visual intercept in a release on September 23, 2026, which included 4.30 meters of massive sulphide. Consequently, the existence of the zone was already known to the market; today’s release serves to confirm the grade rather than reveal a new discovery from scratch.

The Selebi Main resource remains unchanged at 32.47 million tonnes Inferred at 1.53% copper and 0.97% nickel. The new drill hole falls outside the current Mineral Resource Estimate and is not included in the existing resource. As no Preliminary Economic Assessment, reserve, recovery, or mine-life figures have changed, the confirmation of the Lower Zone is considered incremental.

NexMetals is a pre-revenue explorer and developer with large Inferred resources, no Mineral Reserves, no Preliminary Economic Assessment completed, and a going-concern disclosure. At this stage, a new high-grade zone is significant only if it demonstrates the addition of tonnage that can be converted into a mine plan.

The company’s equity is valued at C$46.7 million at a share price of C$1.31. As of September 30, 2026, NexMetals held approximately C$10.4 million in cash. The stock is trading at its 52-week low, having fallen from C$6.22 in January 2026. While strong assay results may produce a modest price bounce, they are unlikely to resolve the financing overhang on their own.

NEXM · Price
Company Overview

NexMetals Mining Corp. (TSXV: NEXM, NASDAQ: NEXM) is a mineral exploration and development company focused on redeveloping the past-producing Selebi copper-nickel-cobalt mines and the Selkirk copper-nickel-cobalt-PGE mine in Botswana. The Selebi assets, comprising Selebi Main and Selebi North, operate under a 115 km² mining lease and utilize existing shaft, power, water, and rail infrastructure. The 2026 Mineral Resource Estimate (MRE) for Selebi reports 8.95 million tonnes (Mt) of Indicated resources at 1.03% copper, 1.08% nickel, and 0.06% cobalt, alongside 41.95 Mt of Inferred resources at 1.45% copper, 1.01% nickel, and 0.05% cobalt. Selebi Main specifically accounts for 32.47 Mt of Inferred resources at 1.53% copper and 0.97% nickel. No Mineral Reserves are reported for the Selebi assets.

The Selkirk asset holds 78.2 Mt of Indicated resources at 0.66% copper equivalent (CuEq) and 15.1 Mt of Inferred resources at 0.60% CuEq, containing copper, nickel, cobalt, platinum, palladium, gold, and silver. The 2026 MRE for Selkirk utilized a US$25/t net smelter return (NSR) cutoff and a 1.02:1 strip ratio. No Mineral Reserves are reported for Selkirk.

Prior-period metallurgical context, not disclosed in today’s release, indicates that the Selebi MRE uses 96.1% copper recovery, 55.6% nickel recovery, and 60.2% cobalt recovery. Selkirk metallurgy assumes 88% copper, 54% nickel, 53% cobalt, 56% platinum, 78% palladium, 72% gold, and 61% silver recovery. The low nickel recovery rate is noted as a value consideration.

Financially, NexMetals reported a Q3 2026 net loss of C$8.9 million, with cash of C$10.36 million at September 30, 2026, and working capital of approximately C$7.1 million. The company issued a going-concern disclosure and currently generates no revenue. A US$30 million deferred asset payment remains due for the earlier of completion/commissioning or December 1, 2029, per the investor presentation.

The company’s capital structure includes approximately 35.65 million basic shares, 60.37 million fully diluted shares, and 14.04 million tradable warrants with a C$8.00 exercise price. At C$1.31, the basic market capitalisation is approximately C$46.7 million.

Read the original news release →

More from NexMetals Mining Corp.