Northwire Canada EditionSunday, November 29, 2026
Northwire
⌕
Gold 3,668.50 +3.8% Silver 43.70 +9.1% Copper 5.52 +3.4% Oil 83.33 −0.4% Palladium 879.00 +5.5% MUN 0.285 +11.8% RNCH 0.030 +0.0% GSKR 2.30 +8.0% ADY 0.370 +5.7% TSK 0.640 +1.6% BAY 0.055 +22.2% CGNT 0.670 −2.9% INFI 0.190 +0.0% GSS 0.045 +50.0% HAY 0.040 +0.0% WRLG 0.430 +1.2% MPVD 0.015 + GGO 0.980 +5.4% NAU 0.530 +6.0% COCO 0.260 +8.3% TBLL 0.045 +12.5% Gold 3,668.50 +3.8% Silver 43.70 +9.1% Copper 5.52 +3.4% Oil 83.33 −0.4% Palladium 879.00 +5.5% MUN 0.285 +11.8% RNCH 0.030 +0.0% GSKR 2.30 +8.0% ADY 0.370 +5.7% TSK 0.640 +1.6% BAY 0.055 +22.2% CGNT 0.670 −2.9% INFI 0.190 +0.0% GSS 0.045 +50.0% HAY 0.040 +0.0% WRLG 0.430 +1.2% MPVD 0.015 + GGO 0.980 +5.4% NAU 0.530 +6.0% COCO 0.260 +8.3% TBLL 0.045 +12.5%
Drill Results Routine +

La Verde Continues to Grow with Another Big Drill Result

Hot Chili’s second-widest La Verde hole confirms grade continuity without revealing a new scale of mineralisation.

Executive Summary

Hot Chili Limited (HCH) has released the final batch of Phase Two assay results from the La Verde Cu-Au porphyry deposit, located 30 km south of the planned Costa Fuego processing hub. The reporting utilizes a nominal 0.20% Cu cut-off, with internal dilution permitted—including zones exceeding 30 m downhole—provided the weighted average remains above the cut-off.

Key intercepts from the final batch include:

  • DKD086 (DD, from surface): 638.0 m @ 0.41% CuEq (0.32% Cu, 0.10 g/t Au, 0.73 g/t Ag, 46 ppm Mo), including 52.8 m @ 0.46% CuEq (0.40% Cu) from surface; or 12.0 m @ 0.67% CuEq from surface; and including 17.2 m @ 0.50% from 153.0 m, 19.3 m @ 0.52% from 214.4 m, 66.3 m @ 0.47% from 286.0 m, 90.0 m @ 0.51% from 412.0 m, 77.2 m @ 0.53% from 539.1 m.
  • DKP067 (RC, updated): 150.0 m @ 0.48% CuEq (0.41% Cu, 0.10 g/t Au) from 4.0 m, including 38.0 m @ 0.57% from 12.0 m and 26.0 m @ 0.70% from 62.0 m. This update adds 38 m of near-surface material to the previously reported interval on 8 Oct 2026 of 112 m @ 0.47% from 42 m.
  • DKP071 (RC): 104.0 m @ 0.49% CuEq (0.40% Cu, 0.12 g/t Au) from 6.0 m, including 32.0 m @ 0.71% from 32.0 m; plus 42.0 m @ 0.35% from 304.0 m and 30.0 m @ 0.25% from 364.0 m.
  • DKP073 (RC): 203.0 m @ 0.43% CuEq (0.34% Cu, 0.12 g/t Au) from 28.0 m to end of hole, including 70.0 m @ 0.65% from 82.0 m (within which 30.0 m @ 0.72%).
  • DKD076 (DD): 198.1 m @ 0.34% CuEq (0.25% Cu, 0.10 g/t Au) from 11.9 m, including 32.2 m @ 0.50% from 19.9 m and 23.9 m @ 0.55% from 284.0 m; separate intervals of 49.5 m @ 0.44% from 270.0 m, 37.7 m @ 0.27% from 378.0 m, 19.8 m @ 0.27% from 442.4 m.
  • DKP066 (RC): 342.0 m @ 0.31% CuEq (0.25% Cu) from surface, including 12.0 m @ 0.52% and 102.0 m @ 0.40%.
  • DKP098 (RC): 86.0 m @ 0.35% CuEq from surface, including 34.0 m @ 0.44%; plus 30.0 m @ 0.41% from 172 m and 20.0 m @ 0.40% from 224 m.
  • DKP069: 64.0 m @ 0.28% CuEq from 50 m and 26.0 m @ 0.32% from 152 m. DKP091: 28.0 m @ 0.22% from 154 m and 12.0 m @ 0.20% from 246 m. DKP093: 26.0 m @ 0.30% from 46 m (or 82.0 m @ 0.25% from 46 m).
  • DKP083, DKP085, DKP087 (RC): no significant intersection.

Phase Two drilling is now complete after 13 months of operations involving two diamond drill (DD) and two reverse circulation (RC) rigs, bringing the total Hot Chili drilling at La Verde to almost 45,000 m. Assays are pending for 21 holes, comprising 10 DD and 11 RC, with remaining results expected by late December 2026. The maiden La Verde Mineral Resource Estimate (MRE) will follow the receipt of these assays. The integration of these results into an expanded Costa Fuego Pre-Feasibility Study (PFS) and Environmental Impact Assessment (EIA) submission is on track for Q2 2027, with Phase Three drilling scheduled to start in the New Year.

Material Impact

Hot Chili Limited (HCH) is a pre-resource explorer on La Verde and a pre-feasibility study-stage developer on Costa Fuego. The company has a market capitalization of A$243 million against a post-tax net present value of US$1.20 billion from its pre-feasibility study, with US$1.27 billion of start-up capital still to be funded. At this stage, only a change in perceived scale, grade, or discovery odds moves the equity.

Recent developments include one 80 m northern step-out at +0.4% Cu; a 38 m near-surface upgrade to DKP067 taking it to 150 m from 4 m; confirmation that DKP071 and DKP073 at the southern extent carry 0.65-0.71% lenses; and the formal completion of Phase Two. The deposit's grade remains at 0.4-0.5% CuEq, at or below the existing Costa Fuego resource grade of 0.45% CuEq. The width envelope remains unchanged, with DKD039's 725 m still the widest. There has been no new centre, and La Verde South's assays are still pending.

The expectation anchor for this zone is DKD039 (8 April 2026, 725 m @ 0.42% CuEq = 304.5 %-m, including 62 m @ 1.03% CuEq), the widest and richest hole to date, with DKD032 (27 November 2025, 529 m @ ~0.56% CuEq) as the discovery marker. The delta: DKD086 at 261.6 %-m is ~86% of DKD039's %-m at effectively identical grade (0.41 vs 0.42% CuEq), with no comparable high-grade base. That is in-line, not a miss, and it comes with a real step-out.

The stock tripled from A$0.71 to A$2.05 between November 2025 and June 2026 on the discovery, but has since round-tripped 41% to A$1.20 and made a fresh closing low for the move the day before this release. It is 69% above its 52-week low but ~30% below where it traded when DKD039 and the La Verde South discovery were published. The market is no longer paying for repetition of the discovery hole; it is waiting for the maiden mineral resource estimate.

This is a confirmation release at model grade that de-risks the late-December maiden MRE and adds a modest northern extension. It sits above the method's band on width and at the bottom of the band on grade, in line with the resource grade, with disclosure good on grade arithmetic and price deck but thin on lab/QA-QC and silent on true width and oxide/sulphide split. It is solid, expected, and incremental.

HCH · Price
Company Overview

Hot Chili Limited (HCH) is an ASX and TSXV-listed copper-gold developer and explorer based in Applecross, Western Australia, with operations in Chile’s coastal Atacama region. The company has approximately 202.7 million shares on issue, along with roughly 6.4 million options and performance rights.

The company’s flagship asset is Costa Fuego, a project at the pre-feasibility study (PFS) stage that combines the Cortadera, Productora, Alice, and San Antonio deposits. The combined indicated resource stands at 798 million tonnes grading 0.45% copper equivalent (CuEq), comprising 0.37% copper, 0.10 grams per tonne gold, and 0.50 parts per million molybdenum, containing 3.62 million tonnes of contained CuEq. An additional inferred resource of 203 million tonnes grades 0.31% CuEq. The deposit is modeled as an open pit containing 736 million tonnes at 0.46% CuEq and an underground component of 62 million tonnes at 0.39% CuEq.

The March 2025 PFS outlines a 20-year mine life, including 14 years of primary production, with a strip ratio of 1.5:1. The project targets an annual production of approximately 116,000 tonnes of CuEq, with a stated growth target of 150,000 tonnes. Financial metrics from the PFS include a post-tax net present value at an 8% discount rate (NPV8) of US$1.20 billion, an internal rate of return (IRR) of 19%, and life-of-mine free cash flow of US$3.86 billion. Start-up capital is estimated at US$1.27 billion, with all-in sustaining costs (C1) of US$1.38 per pound. The plan anticipates a final investment decision (FID) in 2029, first production in 2031, and an environmental impact assessment (EIA) submission in the second quarter of 2027.

La Verde serves as a growth engine for the company. Located approximately 30 km south of the planned central processing hub, this copper-gold porphyry deposit was discovered in late 2025. Exploration has involved approximately 45,000 meters of drilling, and a second center, La Verde South, was confirmed 250 meters along strike in October 2026. A maiden mineral resource estimate (MRE) is scheduled for release in late December 2026.

Hot Chili also holds an 80% stake in Huasco Water, a permitted seawater desalination business designed for zero groundwater use. The project is staged to scale from 500 to 2,300 liters per second.

Regarding financial position, the company reported FY2026 results for the period ending 30 June 2026. Revenue was A$443,000, derived solely from interest. The net loss was A$10.6 million, resulting in earnings per share of -A$0.06. Operating cash outflow was A$8.4 million, while investing outflow reached A$22.0 million. Financing inflows totaled A$50.2 million, leaving cash reserves of A$24.9 million and total equity of A$282.6 million, representing a book value of A$1.39 per share. By 30 September 2026, quarterly reported cash had risen to A$29.3 million with no debt, following A$20.4 million in net proceeds from the OR Royalties amendment. The number of shares on issue increased from 151.6 million to 202.7 million during FY2026.

Ownership structure includes Glencore and GS Group holding approximately 7.5%, Blue Spec holding 5.1%, institutions holding approximately 37%, retail investors holding 43%, and insiders holding 1.6%. The SMEA joint venture is structured as 80% Hot Chili and 20% CMP. Frontera is 100% owned, while San Antonio is held under an option to earn 100%.

Read the original news release →

More from Hot Chili Limited