Northwire Canada EditionSunday, August 9, 2026
Northwire
WHN 0.375 −2.6% LME 0.140 +3.7% AAUC 30.49 +5.3% GGM 0.040 +14.3% FDY 6.18 +3.2% MOG 0.640 +3.2% NEXM 3.20 +1.3% NCAU 0.330 +3.1% LUC 0.160 +0.0% BTR 0.140 +0.0% SMRV 0.200 −16.7% BIG 0.880 +3.5% URC 3.89 +0.0% ATY 0.250 −2.0% NRM 0.075 +7.1% WMS 0.040 +0.0% WHN 0.375 −2.6% LME 0.140 +3.7% AAUC 30.49 +5.3% GGM 0.040 +14.3% FDY 6.18 +3.2% MOG 0.640 +3.2% NEXM 3.20 +1.3% NCAU 0.330 +3.1% LUC 0.160 +0.0% BTR 0.140 +0.0% SMRV 0.200 −16.7% BIG 0.880 +3.5% URC 3.89 +0.0% ATY 0.250 −2.0% NRM 0.075 +7.1% WMS 0.040 +0.0%
Drill Results

Tartisan Nickel prepares for Kenbridge phase 1 drilling

TN · Price

Executive Summary

  • Tartisan Nickel Corp. will commence a Phase 1 diamond drill program of approximately 3,600 m at its wholly‑owned Kenbridge nickel‑copper‑cobalt project in Northwestern Ontario.
  • The program aims to convert inferred resources to measured/indicated categories and test extensions of high‑grade mineralization below the existing 623‑m shaft.
  • Results are intended to improve geological and metallurgical models, support a future prefeasibility study (PFS) and inform mine design.

Key Details

  • Program Scope: ~3,600 metres of NQ diamond drilling across priority targets.
  • Target Objectives:
  • Test extensions of high‑grade nickel‑copper mineralization below the current 623‑m shaft.
  • Expand and upgrade existing resources (inferred → measured/indicated).
  • Enhance geological and metallurgical understanding for PFS preparation.
  • Generate data to support future mine design and resource conversion.
  • Project Context: Kenbridge deposit lies within a 4,273‑hectare area of patented and staked claims with road access from Sioux Narrows and Kenora, Ontario.
  • CEO Comment: Mark Appleby emphasized that the drill program is “an important step in advancing the Kenbridge project toward production readiness” and will strengthen the resource base for engineering studies.

Notable Quotes

“The upcoming phase 1 drill program represents an important step in advancing the Kenbridge project toward production readiness. Our objective is to strengthen the resource base and advance engineering studies that will form the backbone of our prefeasibility work.” – Mark Appleby, CEO, Tartisan Nickel Corp.

Read the original news release →

More from Tartisan Nickel Corp