Drill Results
Junior Miners Take Center Stage as Record Gold Prices Trigger Search for High-Grade Discovery
Cassiar Pivots to High-Grade Discovery and Infrastructure Evaluation as Resource Confidence Hits Critical Mass

Executive Summary
- The most recent company-specific news (January 23, 2026) reports final 2025 drill results from the Newcoast prospect, revealing significant high-grade intercepts including 15.7m at 3.8 g/t Au (containing visible gold) and 22.5m at 3.52 g/t Au.
- Management has shifted strategy for 2026 to include evaluating mill refurbishment, tailings monetization, and a focused high-grade exploration program at Cassiar South.
- A third-party research initiation (January 15, 2026) by Stonegate Capital Partners and inclusion in a sponsored sector report (January 29, 2026) indicate an aggressive push into investor marketing and external validation.
- Previous 2025 drilling at the Taurus deposit (December 3, 2025) confirmed high-grade continuity with results such as 13.4m at 13.53 g/t Au.
Material Impact
- The January 23 results are materially positive as they transform Newcoast from a secondary target into a potential high-grade discovery that could significantly enhance the average grade of the existing 2.34-million-ounce resource.
- The visible gold in hole 25NC-017 suggests the presence of a new, high-grade mineralized structure previously undocumented.
- The shift toward mill refurbishment evaluation and tailings monetization indicates a transition from pure exploration to a development-minded approach, potentially shortening the timeline to cash flow.
- The 2025 Resource Estimate (September 9, 2025) showed 91% of the resource is within 150m of the surface, suggesting low-cost open-pit potential, which is reinforced by the latest near-surface drill hits.
GLDC · Price
Company Overview
- Cassiar Gold Corp. is focused on its 100% owned Cassiar Gold Project in Northern British Columbia, covering 59,000 hectares.
- The project is split into Cassiar North (hosting the Taurus bulk-tonnage deposit) and Cassiar South (hosting high-grade past-producing mines).
- Flagship Resource (Taurus Deposit): 410,000 oz Indicated (1.43 g/t Au) and 1,930,000 oz Inferred (0.95 g/t Au) as of June 2025.
- The project benefits from existing infrastructure, including a 155 km2 permitted mine site and access to the Stewart-Cassiar Highway.
More from Cassiar Gold Corp.
Jun 18, 2026 · 07:01