Northwire Canada EditionFriday, November 13, 2026
Northwire
⌕
Gold 3,881.60 −0.1% Silver 49.16 −1.8% Copper 6.11 −1.3% Oil 88.94 +0.3% Palladium 1,012.50 +2.1% CLV 0.120 + VUL 0.365 −4.0% LUNR 15.84 −2.0% XTG 2.02 +1.0% RUA 1.12 +1.8% TUF 0.620 +0.0% NEXG 1.13 −0.9% ELEF 0.280 +0.0% LVG 0.330 −2.9% BBB 0.510 +2.0% NGC 0.055 −8.3% ABRA 10.52 −2.4% OBUL 0.345 +0.0% MKO 10.78 −0.4% SGML 7.44 +5.1% CERT 2.20 +3.8% Gold 3,881.60 −0.1% Silver 49.16 −1.8% Copper 6.11 −1.3% Oil 88.94 +0.3% Palladium 1,012.50 +2.1% CLV 0.120 + VUL 0.365 −4.0% LUNR 15.84 −2.0% XTG 2.02 +1.0% RUA 1.12 +1.8% TUF 0.620 +0.0% NEXG 1.13 −0.9% ELEF 0.280 +0.0% LVG 0.330 −2.9% BBB 0.510 +2.0% NGC 0.055 −8.3% ABRA 10.52 −2.4% OBUL 0.345 +0.0% MKO 10.78 −0.4% SGML 7.44 +5.1% CERT 2.20 +3.8%
Financings

Thunder Gold Upsizes Private Placement of Flow-Through Units to $2.15 Million

Thunder Gold Secures Exploration Funds as Maiden Resource Estimate Looms

Executive Summary

On December 17, 2025, Thunder Gold Corp. announced an increase to its previously announced (December 12, 2025) non-brokered private placement. The financing has been upsized from C$2.0 million to C$2.15 million due to strong investor demand.

The offering consists of up to 28,666,667 flow-through units at a price of C$0.075 per unit. Each unit includes one flow-through common share and one common share purchase warrant. Each warrant allows the holder to purchase an additional common share at an exercise price of C$0.10 for 18 months.

The proceeds will be used to fund the ongoing exploration program at the company's 100%-owned Tower Mountain Gold Property in Ontario, with expenditures qualifying as "flow-through mining expenditures".

Material Impact

The news of upsizing the private placement is a routine but positive development. It follows strong Phase 3 drill results released on December 8 and precedes a highly anticipated maiden Mineral Resource Estimate (MRE) expected in January 2026.

Progression of Company Projections

  • Early 2025: Following excellent drill results at the new "P-Target" in January, the company set an aggressive tone. In March, the CEO outlined a goal to demonstrate the potential to double a conceptual exploration target of 40-80 million tonnes at 0.80 to 1.20 g/t Au.
  • Mid 2025: Phase 1 drill results reported in May were underwhelming, with very low grades (0.1-0.2 g/t Au) that missed the stated targets. The company attributed this to drilling geometry issues. This was a clear miss on expectations, but was quickly followed by a successful C$1.6 million financing in June to fund subsequent phases.
  • Late 2025: The company's projections were strongly validated by outstanding results from the Phase 2 and Phase 3 drill programs.
    • September 8: Phase 2 results included exceptional intercepts like 1.25 g/t Au over 103.5 metres and 4.22 g/t Au over 82.5 metres, confirming the scale and consistency of mineralization.
    • October 21: The company formally engaged Micon International to complete the maiden MRE, a critical de-risking step that solidified the path forward.
    • December 8: Phase 3 results confirmed broad, continuous, lower-grade mineralization (e.g., 0.47 g/t Au over 333.0 metres), consistent with the bulk tonnage, open-pit model required for the MRE.

Assessment of Current News

The current financing, priced at a 25% premium (C$0.075) to the recent trading price (C$0.06), and its subsequent upsizing, indicates robust institutional and investor confidence in the project ahead of the MRE. It secures the necessary capital to continue exploration without interruption. While dilutive, this is standard procedure for an exploration company at this stage. The financing confirms the company is successfully executing its strategy of de-risking the project through drilling and advancing it toward a resource definition. The impact is positive but not material, as it is an expected operational step rather than a fundamental change to the project's potential.

TGOL · Price
Company Overview

Thunder Gold Corp. is a junior mineral exploration company focused on gold. Its flagship asset is the 100%-owned Tower Mountain Gold Property, a 2,500-hectare project located approximately 50 km west of Thunder Bay, Ontario. The property has excellent infrastructure, being adjacent to the Trans-Canada Highway. The geological thesis is centered on a large-scale, intrusion-related, bulk-tonnage gold system. The company's work has demonstrated gold mineralization on both the western and eastern perimeters of the Tower Mountain Intrusive Complex, suggesting significant size potential.

Read the original news release →

More from Thunder Gold Corp.