Northwire Canada EditionMonday, September 21, 2026
Northwire
GOLD 4424.90 +0.6% SILVER 67.15 +1.6% COPPER 6.69 +0.5% OIL 96.08 −5.7% PALLADIUM 1319.50 +1.3% ARIC 0.760 −1.3% DCOP 0.095 +0.0% GLO 0.620 +3.3% CCM 0.770 +1.3% FAN 0.750 +2.7% FL 0.450 −1.6% BGF 0.030 +0.0% KLD 2.25 −0.4% SLVR 1.17 +1.7% LEM 0.250 +0.0% GENM 0.610 −3.2% SICO 9.80 +1.0% CTV 0.125 +0.0% CTM 0.140 +0.0% RSMX 0.110 −4.3% FT 0.145 +3.6% GOLD 4424.90 +0.6% SILVER 67.15 +1.6% COPPER 6.69 +0.5% OIL 96.08 −5.7% PALLADIUM 1319.50 +1.3% ARIC 0.760 −1.3% DCOP 0.095 +0.0% GLO 0.620 +3.3% CCM 0.770 +1.3% FAN 0.750 +2.7% FL 0.450 −1.6% BGF 0.030 +0.0% KLD 2.25 −0.4% SLVR 1.17 +1.7% LEM 0.250 +0.0% GENM 0.610 −3.2% SICO 9.80 +1.0% CTV 0.125 +0.0% CTM 0.140 +0.0% RSMX 0.110 −4.3% FT 0.145 +3.6%
Drill Results

Starcore Finalizes Silver Mine Lease

SAM · Price

Executive Summary

  • Starcore International Mines finalized a ten‑year lease on the historic San Juan Nepomuceno (“Tortilla”) Project in Queretaro, Mexico for MX$5 million.
  • Initial drilling/intercept work identified high‑grade silver zones: Oxides Zone (424 g/t Ag) and Sulfide Zone (973 g/t Ag), with accompanying gold grades of 0.51 g/t and 0.43 g/t respectively.
  • Preliminary flotation metallurgical tests on sulfide samples returned strong recoveries (91.5% Ag, 48.3% Au), indicating the ore is treatable by conventional methods.

Key Details

  • Lease Terms:
  • Total consideration MX$5,000,000 (≈US$268,500).
  • MX$2,000,000 paid at signing; six monthly payments of MX$500,000 from Nov 9 2025 to Apr 9 2026.
  • Lessor entitled to a 2% Net Smelter Return (NSR) on production after lease payments are completed.
  • Lessor may sell all claims/concessions to Starcore for US$5 million within the lease term; NSR can be purchased by Starcore for US$2 million.

  • Project Location & History:

  • Historic silver mine (El Doctor) operated 1557‑1870; later briefly explored by O.J. Braniff in late 1800s.
  • Site lies ~150 km from Santiago de Queretaro, 40 km NE of San Martin Mining Unit, and 5 km W of La Negra Mine.

  • Exploration Results – Mineralized Zones:

  • Oxides Zone: Avg. 424 g/t Ag, 0.51 g/t Au; sampling width 1.45 m (gallery).
  • Sulfide Zone: Avg. 973 g/t Ag, 0.43 g/t Au; sampling width 2.80 m (gallery).
  • Grades increase with depth, suggesting greater potential at lower levels.

  • Metallurgical Testing:

  • Flotation of sulfide samples yielded 91.49% silver recovery and 48.25% gold recovery.

  • Management Comments:

  • “We are really excited about the potential and economic value of the Tortilla Project… we believe this investment will deliver significant returns for our shareholders.” – Robert Eadie, President & CEO.

  • Qualified Person: Salvador Garcia, B.Eng., Director & COO, qualified under NI 43‑101.

Notable Quotes

“If our technical and metallurgical analyses are confirmed, we believe this investment will deliver significant returns for our shareholders.” – Robert Eadie, President & CEO.

Read the original news release →

More from Starcore International Mines Ltd.