Northwire Canada EditionFriday, November 13, 2026
Northwire
⌕
Gold 3,881.80 −0.1% Silver 48.91 −2.3% Copper 6.08 −1.9% Oil 88.60 −0.2% Palladium 1,002.50 +1.1% BMR 0.165 +0.0% CLV 0.120 + VUL 0.360 −5.3% LUNR 15.42 −4.6% XTG 2.08 +4.0% RUA 1.08 −1.8% TUF 0.610 −1.6% NEXG 1.12 −1.8% ELEF 0.275 −1.8% LVG 0.345 +1.5% BBB 0.510 +2.0% NGC 0.060 +0.0% ABRA 10.54 −2.2% OBUL 0.345 +0.0% MKO 10.48 −3.1% SGML 7.17 +1.3% Gold 3,881.80 −0.1% Silver 48.91 −2.3% Copper 6.08 −1.9% Oil 88.60 −0.2% Palladium 1,002.50 +1.1% BMR 0.165 +0.0% CLV 0.120 + VUL 0.360 −5.3% LUNR 15.42 −4.6% XTG 2.08 +4.0% RUA 1.08 −1.8% TUF 0.610 −1.6% NEXG 1.12 −1.8% ELEF 0.275 −1.8% LVG 0.345 +1.5% BBB 0.510 +2.0% NGC 0.060 +0.0% ABRA 10.54 −2.2% OBUL 0.345 +0.0% MKO 10.48 −3.1% SGML 7.17 +1.3%
Drill Results

Irving Resources Reviews First Year of Work with JX Advanced Metals Corporation at Omu Project, Hokkaido, Japan

IRV · Price

Executive Summary

  • Irving Resources provided an update on its first year of work with JX Advanced Metals at the Omu Project in Hokkaido, Japan, highlighting successful shallow‑angle drilling results.
  • Five shallow drill holes at the Omui Mining License defined a ~200 m north‑south mineralized corridor, including a high‑grade gold zone (24.22 g/t Au, 173.40 g/t Ag) in hole 25OMI‑002.
  • A vertical diamond hole at Omu Sinter Pit (hole 25OMS‑001) returned a 41.81 m thick intercept with 96.6% silica, 0.54 g/t Au and 8.7 g/t Ag, confirming continuity of the high‑silica horizon above the water table.

Key Details

  • Option Agreement: JX Metals may earn up to a 75% interest in Omu Sinter Pit (1.962 km²) and up to 75% in Omuisenbu (0.127 km²) after incurring ¥300 M in exploration/property expenditures over three years. First‑year requirements have been satisfied.
  • Drill Hole 24OMI‑001 (Omui Mining License): 101.1 m wide intercept; 1.14 g/t Au, 16.0 g/t Ag, 84% silica.
  • Four additional shallow holes (2025) at Omui: All encountered broad, shallow mineralized intercepts, extending the corridor to ~200 m length, open north and south.
  • High‑grade zone – Hole 25OMI‑002: 2 m wide; 24.22 g/t Au, 173.40 g/t Ag.
  • Drill Hole 25OMS‑001 (Omu Sinter): 41.81 m thick intercept; silica 96.6%; gold 0.54 g/t; silver 8.7 g/t. Water table encountered at 30 m depth (≈9 m above sea level); deposit largely above water table.
  • Next Steps: Planning further drilling to test groundwater levels, continuity, and extensions of the shallow silica‑rich gold‑silver deposit; advancing Omu Sinter Pit and Omuisenbu toward becoming a new source of smelter flux in Japan.
  • Qualified Person: Dr. Quinton Hennigh (Ph.D., P.Geo.), technical advisor and director, reviewed and approved all technical information per NI 43‑101.

Notable Quotes

  • “Irving considers assay results from its low‑angle drilling program to be very favourable.” – Company statement referencing October 31 2025 release.
Read the original news release →

More from Irving Resources Inc.