Northwire Canada EditionThursday, August 13, 2026
Northwire
CD 0.245 +8.9% DRY 0.310 +1.6% PAAS 73.10 +1.3% S 0.250 −2.0% VOXR 7.22 −0.4% NFG 2.32 +0.0% MFG 3.70 +0.0% ITH 3.90 +1.8% DML 4.59 +0.0% SEVA 0.285 −5.0% CLM 0.055 −8.3% ORE 2.65 −0.4% OOR 0.050 +0.0% MJS 0.095 −5.0% DBG 2.01 −1.0% MOG 0.630 +8.6% CD 0.245 +8.9% DRY 0.310 +1.6% PAAS 73.10 +1.3% S 0.250 −2.0% VOXR 7.22 −0.4% NFG 2.32 +0.0% MFG 3.70 +0.0% ITH 3.90 +1.8% DML 4.59 +0.0% SEVA 0.285 −5.0% CLM 0.055 −8.3% ORE 2.65 −0.4% OOR 0.050 +0.0% MJS 0.095 −5.0% DBG 2.01 −1.0% MOG 0.630 +8.6%
Drill Results

Doubleview Gold Corp Announces Increased Footprint and Potential Volume at Its Hat Polymetallic Deposit in Northwestern British Columbia

DBG · Price

Executive Summary

  • Recent drilling (holes H093‑H096) in the southeast Lisle Zone of the Hat Project significantly expands the mineralized footprint by ~400 m × 330 m, extending beyond the 2024 Preliminary Mineral Resource pit wall.
  • Multiple high‑grade copper‑equivalent intercepts were intersected, including a 9 m interval with 9.88 % CuEq and several >1 % CuEq zones.
  • The new data will be incorporated into an upcoming Revised Maiden Resource Estimate (2025) and the ongoing Preliminary Economic Assessment, potentially upgrading resources to higher confidence categories and prompting a redesign of the open‑pit layout.

Key Details

  • Hole H093: 640.7 m total from 16.3 m to 657.0 m; overall 0.34 % CuEq with a 133 m sub‑interval at 1.03 % CuEq (0.65 % Cu, 0.40 g/t Au). Notable high‑grade sections:
  • 39 m @ 0.52 % CuEq (0.63 % Cu, 0.39 g/t Au)
  • 15 m @ 1.03 % CuEq (1.18 % Cu, 0.79 g/t Au)
  • 21 m @ 4.78 % CuEq (4.19 % Cu, 1.76 g/t Au)
  • 9 m @ 9.88 % CuEq (9.01 % Cu, 3.46 g/t Au)

  • Hole H094: 510.0 m from 30 m to 540 m; overall 0.22 % CuEq; includes a 122 m interval at 0.26 % CuEq and a 107.6 m interval at 0.30 % CuEq.

  • Hole H095: 110 m from 430 m to 540 m; overall 0.91 % CuEq (0.50 % Cu, 0.12 g/t Au).

  • Hole H096: 681.4 m from 38.6 m to 720 m; overall 0.37 % CuEq with a 71 m sub‑interval at 1.01 % CuEq (0.54 % Cu, 0.51 g/t Au).

  • Footprint Expansion: Approximate new mineralized domain added – ~400 m × 330 m to the east of existing Lisle Zone limits.

  • Assay Methodology & QA/QC: Samples processed by AGAT Laboratories (ISO‑17025/9001); chain‑of‑custody, blanks, duplicates, and certified reference materials employed.

  • CuEq Calculation Parameters:

  • Au $2,365.09/oz, Ag $27.43/oz, Cu $4.17/lb, Co $14.76/lb
  • Recoveries – Au 89 %, Ag 68 %, Cu 84 %, Co 78 %

  • Forward‑Looking Statements: Results will be fed into the Revised Maiden Resource Estimate (2025) and the ongoing Preliminary Economic Assessment; anticipated resource upgrades and pit redesign.

Notable Quotes

“The new drill holes will be added in a revised MRE (Maiden Resource Estimate 2025) and the PEA that is on‑going… Both the ‘footprint’ and value of our project have been greatly increased, not only by the expansion but also by the recent dramatic increase in metal, mineral and commodity prices.” – Farshad Shirvani, President & CEO


Materiality Assessment: Material – Positive (significant expansion of resource potential and high‑grade intercepts likely to affect valuation).

Read the original news release →

More from Doubleview Gold Corp.