Northwire Canada EditionSunday, August 9, 2026
Northwire
WHN 0.375 −2.6% LME 0.140 +3.7% AAUC 30.49 +5.3% GGM 0.040 +14.3% FDY 6.18 +3.2% MOG 0.640 +3.2% NEXM 3.20 +1.3% NCAU 0.330 +3.1% LUC 0.160 +0.0% BTR 0.140 +0.0% SMRV 0.200 −16.7% BIG 0.880 +3.5% URC 3.89 +0.0% ATY 0.250 −2.0% NRM 0.075 +7.1% WMS 0.040 +0.0% WHN 0.375 −2.6% LME 0.140 +3.7% AAUC 30.49 +5.3% GGM 0.040 +14.3% FDY 6.18 +3.2% MOG 0.640 +3.2% NEXM 3.20 +1.3% NCAU 0.330 +3.1% LUC 0.160 +0.0% BTR 0.140 +0.0% SMRV 0.200 −16.7% BIG 0.880 +3.5% URC 3.89 +0.0% ATY 0.250 −2.0% NRM 0.075 +7.1% WMS 0.040 +0.0%
Drill Results

Vanguard Mining Commences 2025 Diamond Drill Program at Redonda Copper-Molybdenum Project, British Columbia

UUU · Price

Executive Summary

  • Vanguard Mining Corp. has launched its 2025 diamond drill program at the 100%-owned Redonda Copper‑Molybdenum Project in British Columbia.
  • The program will target up to 10 permitted drill sites, with deeper holes (>500 m) planned to test the potassic core and structural corridors identified from a late‑2024 airborne geophysical survey.
  • Vanguard is fully funded for the exploration work and has engaged Paradigm Drilling Ltd. to operate a Boyles T‑75 hydraulic, track‑mounted diamond drill capable of reaching >600 m depth; collaboration with the Klahoose First Nation will continue throughout the campaign.

Key Details

  • Project Scope: 2,746.46 ha (nine mineral claims) near Campbell River, BC; fully permitted for up to 10 drill sites.
  • Drilling Equipment: Boyles T‑75 hydraulic, track‑mounted rig with NQ tooling; capable of testing targets to depths exceeding 600 m.
  • Target Selection: Based on Precision GeoSurveys airborne geophysical data (magnetic intensity, gradient magnetics, radiometrics) integrated with recent drilling and surface sampling results.
  • Historical Intercepts: Prior holes returned up to 142.6 m grading 0.279% Cu and 0.0281% Mo; surface samples showed 3.1–48 m intervals averaging ~0.529% CuEq. A 174‑m near‑surface mineralized interval was also noted.
  • Program Objectives:
  • Drill step‑out holes to evaluate continuity of porphyry‑style Cu‑Mo mineralization along prioritized structural trends.
  • Map brecciation trends and conduct deeper drilling (>500 m) into the known potassic core.
  • Test potential north–south extensions and a ~1 km northwest extension along an old road system.
  • Assess southern plunge beneath the Coast Plutonic Complex with additional geophysics and drilling.
  • Investigate iron‑skarn occurrences on east Redonda Island for district‑scale magmatic‑hydrothermal potential.
  • Partnerships: Ongoing collaboration with Klahoose First Nation for local labour, training, and use of affiliated service providers; adherence to cultural heritage and environmental protocols.
  • Funding: The 2025 program is fully funded (no additional financing disclosed).
  • Qualified Person: J. T. Shearer, M.Sc., D.I.C., P.Geo. (NI 43‑101 Qualified Person) reviewed and approved the technical information.

Notable Quotes

“Drilling is now underway at Redonda, launching our 2025 program… Our goal this season is simple: build on the 2023–2024 discovery and start defining the true scale of the Redonda system.” – David Greenway, CEO

Read the original news release →

More from Vanguard Mining Corp.