Northwire Canada EditionSaturday, August 1, 2026
Northwire
S 0.140 +0.0% BNKR 4.40 −2.2% QRO 0.045 +0.0% VCT 0.075 +36.4% PPP 1.15 +0.9% LMG 0.390 +0.0% GRDM 0.140 +0.0% ABRA 13.58 −4.1% WHY 0.295 +1.7% HHH 3.94 −0.2% COS 0.060 +0.0% NOB 0.065 −23.5% MEK 0.055 +0.0% TGOL 0.105 −4.5% FCI 0.400 −7.0% SGQ 0.350 +0.0% S 0.140 +0.0% BNKR 4.40 −2.2% QRO 0.045 +0.0% VCT 0.075 +36.4% PPP 1.15 +0.9% LMG 0.390 +0.0% GRDM 0.140 +0.0% ABRA 13.58 −4.1% WHY 0.295 +1.7% HHH 3.94 −0.2% COS 0.060 +0.0% NOB 0.065 −23.5% MEK 0.055 +0.0% TGOL 0.105 −4.5% FCI 0.400 −7.0% SGQ 0.350 +0.0%
Drill Results

Taranis Completes 2025 Exploration Activities Targeting Expansion of Thor Mineral Resource

TRO · Price

Executive Summary

  • Taranis completed a summer 2025 drilling program on the Thor project – 5 holes totaling 2,505 m, including three deep holes (2,273 m) intersecting a magmatic breccia feeder zone.
  • In January 2025 the company acquired 1,634 ha of additional mineral tenure adjacent to Thor, covering historic Nettie L. and IXL mine areas with known silver‑gold‑zinc‑lead‑copper production and potential strategic metals.
  • Planning and cost estimate for a 10,000‑ton bulk sample at Thor were finalized; the company is seeking Ministry approval and has begun XRF analysis to support future economic studies.

Key Details

  • Diamond Drilling: 5 drill holes (2,505 m total); 3 deep holes (2,273 m) and 2 shallow holes (232 m). Intersections include a magmatic breccia “feeder zone” typical of high‑sulfidation epithermal systems. Analytical results pending.
  • New Prospects Acquisition: 1,634 ha of mineral tenure added in early Jan 2025; includes historic Nettie L. and IXL mine sites with past production of Ag, Au, Zn, Pb, Cu and potential indium, cadmium, tungsten, antimony. Access gained via helicopter; surface dump sampling performed.
  • 10,000‑t Bulk Sample: Planning and cost estimate completed; presentation available on Taranis website. Bulk sample intended to determine metal recoveries before any economic analysis. XRF analyses of source material conducted; confirmatory work at Actlabs underway.
  • Additional Exploration Activities: Systematic XRF studies of drill core oxide alteration, continued soil sampling in Horton area (high‑grade boulders identified 2024), LIDAR re‑evaluation revealing large rockslide (~800 m × 2,200 m) potentially obscuring mineralization; seep sampling performed.
  • Qualified Person: Exploration overseen by John J. Gardiner (P.Geo.), President & CEO, who reviewed and approved the release.
  • Share Count Disclosure: 102,421,487 shares issued and outstanding (119,972,613 on a fully‑diluted basis).

Notable Quotes

  • “Taranis believes that it can add substantial value above and beyond the existing NI‑43‑101 Mineral Resource via systematic and state‑of‑the‑art exploration.” – John J. Gardiner, President & CEO.
Read the original news release →

More from Taranis Resources Inc.