Northwire Canada EditionWednesday, August 12, 2026
Northwire
GRC 0.075 +7.1% FNV 334.84 −0.2% ZNG 0.830 +0.0% ITR 3.61 −2.4% AVX 0.005 −nan% ETG 2.52 −2.3% PPP 1.36 +0.0% EFF 0.025 +0.0% NVX 0.540 +25.6% NG 10.68 +0.4% ELE 27.08 +1.9% EM 3.95 −1.2% SGML 16.51 +0.1% ADZ 0.100 +0.0% AFM 1.50 −9.6% OMI 0.275 −3.5% GRC 0.075 +7.1% FNV 334.84 −0.2% ZNG 0.830 +0.0% ITR 3.61 −2.4% AVX 0.005 −nan% ETG 2.52 −2.3% PPP 1.36 +0.0% EFF 0.025 +0.0% NVX 0.540 +25.6% NG 10.68 +0.4% ELE 27.08 +1.9% EM 3.95 −1.2% SGML 16.51 +0.1% ADZ 0.100 +0.0% AFM 1.50 −9.6% OMI 0.275 −3.5%
Drill Results

Red Pine Commences Surface Trenching and Sampling Programme in Potential Open Pit Areas at Wawa Gold Project

RPX · Price

Executive Summary

  • Red Pine Exploration has commenced a mechanized surface‑trenching, geologic mapping and channel‑sampling program in the northern “North Pit” area of its Wawa Gold Project to better define open‑pit gold mineralization.
  • The trenching targets ~60 m of strike length over high‑grade quartz veins; satellite trenches will extend mineralization knowledge beyond the main line.
  • Recent historic drill intercepts in the same zone include 45.38 g/t Au over 3.13 m (including 141 g/t Au over 0.88 m) and 14.51 g/t Au over 4.81 m (including 90.40 g/t Au over 0.67 m), underscoring the area’s high‑grade potential.

Key Details

  • Program Scope: Mechanized trenching of ~60 m along the Jubilee Shear strike within existing mining patents and leases; additional satellite trenches planned on identified veins.
  • Sampling Plan: Detailed geological mapping and systematic channel sampling of quartz veins encountered in trenches.
  • Historical High‑Grade Intercepts (North Pit area):
  • 45.38 g/t Au over 3.13 m (incl. 141 g/t Au over 0.88 m) – hole SD‑25‑559 (June 18 2025 release).
  • 14.51 g/t Au over 4.81 m (incl. 90.40 g/t Au over 0.67 m) – hole SD‑25‑552 (May 12 2025 release).
  • 109.00 g/t Au over 0.86 m – historic hole U0590L3 (NI 43‑101 report, Sep 30 2024).
  • 176.00 g/t Au over 0.78 m – historic hole SD‑16‑45 (NI 43‑101 report, Sep 30 2024).
  • Baseline Environmental Studies: Installation of eight monitoring wells and packer testing of drill holes to constrain groundwater flow; ongoing fauna data collection.
  • Future Deliverables: Updated mineral resource estimate, mine design, metallurgical studies, and a Preliminary Economic Assessment (PEA) slated for H1 2026.
  • QA/QC Protocols: Half‑core sampling with sealed bags, duplicate quarter‑core inserts, external gold standards/blanks every 20 samples, fire‑assay (50 g) with AA finish or 1 kg metallic screen assay for coarse‑gold samples; ~5 % of pulps/coarse rejects sent to Agat Laboratories for umpire testing.
  • Qualified Person: Jean‑François Montreuil, P.Geo., Vice President – Exploration, has reviewed and approved the technical information per NI 43‑101.

Notable Quotes

“We are pleased to announce that a surface trenching program has started in the northern zone, targeting a potential open pit, where recent drilling has returned a number of higher‑grade intersections.” – Michael Michaud, President & CEO


All forward‑looking statements are subject to risks and uncertainties detailed in the full release.

Read the original news release →

More from RPX Gold Inc.