Northwire Canada EditionWednesday, July 22, 2026
Northwire
UTWO 0.450 +0.0% MUX 25.77 +3.1% CNL 19.23 +5.4% GR 0.065 +0.0% KNG 1.12 +9.8% TMET 0.110 +10.0% AGX 0.710 +2.9% UTWO 0.450 +0.0% MUX 25.77 +3.1% CNL 19.23 +5.4% GR 0.065 +0.0% KNG 1.12 +9.8% TMET 0.110 +10.0% AGX 0.710 +2.9%
Technical Study

Power Metals completes final cesium tests at Case Lake

PWM · Price

Executive Summary

  • Power Metals Corp. successfully produced technical‑grade cesium formate (99.8 % purity, 2.23 g/mL density) and cesium chloride (99.6 % purity) from Case Lake pollucite concentrate, confirming a 97 % cesium extraction efficiency.
  • The results de‑risk the West Joe pegmatite zone and demonstrate near‑term feasibility for commercial-scale production of high‑purity cesium chemicals, lithium, and tantalum concentrates.
  • CEO Haydn Daxter and Chairman Johnathan More highlighted the milestone as proof that Case Lake can become a low‑impurity, cost‑effective North American source of critical minerals for multiple end‑markets (oil & gas, solar/battery, military, medical).

Key Details

  • Extraction Efficiency: 97 % cesium extraction from pollucite concentrate (average feed grade 19.5 % Cs₂O).
  • Cesium Formate: Technical grade, 99.8 % purity, density 2.23 g/mL (industry range 2.2–2.4 g/mL).
  • Cesium Chloride: Technical grade, 99.6 % purity with very low impurities.
  • Crystallization Process: Two‑stage crystallization at 50 °C and 20 °C achieved overall crystal recovery efficiencies of 95–98 %; recrystallization yielded final efficiencies up to 98 %.
  • Sample Origin: Blended concentrate from Phase I ore‑sorting (samples 24‑036‑01P & 24‑036‑03P), crushed to 100 % passing 106 µm.
  • Test Facility: SGS Canada, Lakefield, Ontario – independent qualified person verification.
  • Additional Milestones: Confirms ability to produce technical‑grade cesium chemicals, lithium concentrate (Li₂O) and tantalum concentrate (Ta) from the same ore stream; supports de‑risking of Phase I & II XRT ore‑sorting, bulk sample production, and future commercial operations.
  • Project Context: Case Lake remains the only global project with near‑term cesium production capacity; over 7,000 m of drilling completed to date.
  • Quotes:
  • Haydn Daxter (CEO): “The completion of our metallurgical testwork… confirms Case Lake as a near‑term cesium operation with low impurity and cost‑effective processing for the North American market.”
  • Johnathan More (Chairman): “This final round of metallurgical testwork… demonstrates strong confidence to shareholders as we continue to de‑risk the project in preparation for production.”

Notable Quotes

See above.

Read the original news release →

More from Power Metals Corp.