Drill Results
Rackla expands NWT drilling, awaits assay results

RAK · Price
Executive Summary
- Rackla Metals increased its 2025 exploration drill program by 25 % to a total of 5,000 m after early core observations expanded the known mineralized zone at the BiTe showing.
- To date, >3,100 m have been drilled across seven holes (G25‑001 to 007); all intersected sheeted quartz/sulphide‑tourmaline veins with bismuth sulphide mineralization and a broad high‑grade quartz/ tourmaline zone at depth.
- Samples from holes G25‑001 – 003 are expected within the coming week, with additional assay results pending; mapping indicates a metal zonation (arsenic‑rich ridge top, bismuth‑rich lower ridges) supporting a reduced intrusion‑related gold system model.
Key Details
- Drill Program Expansion: Original plan increased by 25 % to 5,000 m total based on encouraging core and surface work.
- Current Drilling Status: Hole G25‑008 underway, target depth 500 m; previous seven holes (G25‑001 – 007) completed, totaling >3,100 m drilled over a 500 × 300 × 550 m area.
- Core Observations:
- Abundant sheeted veining in all completed holes.
- Bismuth sulphide mineralization present throughout.
- Broad zone of intense quartz‑tourmaline veining with elevated bismuth intersected at tops of G25‑004 & 005; same zone reproduced in G25‑006 & 007 (125 m west).
- Assay Pipeline: Samples from holes G25‑001 – 003 to be received within a week; results from remaining holes expected on a rolling basis.
- Surface Mapping: Recent work shows metal zonation—arsenic‑rich gossanous ridge top, bismuth‑rich lower ridges; assays pending. Interpretation aligns with reduced intrusion‑related gold system (RIRGS) model.
- Land Holdings: Company has increased its land holdings in the region following successful regional exploration results.
- Community Relations: Ongoing consultation with Sahtu Dene and Métis communities; commitment to collaborative relationships and regulatory compliance emphasized.
- Qualified Person: Scott Casselman, BSc, PGeo, VP Exploration, reviewed and approved technical information per NI 43‑101.
Notable Quotes
(No direct quotes provided in the release.)
More from Rackla Metals Inc.
Jul 02, 2026 · 11:21