NevGold Releases Significant Oxide Gold-Antimony Results: 11.41 g/t AuEq Over 6.1 Meters (10.60 g/t Au And 0.18% Antimony) Within 2.19 g/t AuEq Over 56.4 Meters (1.74 g/t Au And 0.10% Antimony) at the Limousine Butte Project, Nevada

Executive Summary
- NevGold reported multiple high‑grade oxide gold‑antimony intercepts from the 2025 drill program at Resurrection Ridge, including a standout 11.41 g/t AuEq over 6.1 m (RR03_01).
- Eight drill holes have been completed for the 2025 campaign with assays pending; the company expects to advance toward an initial gold‑antimony Mineral Resource Estimate (“MRE”) later in 2025.
- Phase II metallurgical testwork on gold and antimony is underway, with results anticipated in the coming weeks, supporting de‑risking of the project.
Key Details
- High‑grade intercepts (AuEq):
- RR03_01 – 11.41 g/t AuEq over 6.1 m (10.60 g/t Au, 0.18 % Sb) within 2.19 g/t AuEq over 56.4 m.
- LB010 – 3.19 g/t AuEq over 26.2 m (2.24 g/t Au, 0.21 % Sb) within 2.16 g/t AuEq over 57.2 m.
- LB028 – 4.62 g/t AuEq over 6.1 m (0.14 g/t Au, 1.00 % Sb) within 0.66 g/t AuEq over 128.0 m.
-
LB133 – 1.78 g/t AuEq over 12.2 m (0.11 g/t Au, 0.37 % Sb).
-
Assay methodology: Gold fire assay (30 g) and multi‑element ICP‑OES; QA/QC includes blanks, duplicates, standards per ISO 17025 labs.
-
Drill program status:
- Total of 8 holes completed in 2025; assays pending.
-
Ongoing activities: historical data review, continued drilling on gold‑antimony targets, metallurgical testwork (Phase II), and preparation of an initial MRE.
-
Historical context:
- Historic drill results from 2021‑2024 show consistent low‑grade Au and Sb mineralization across a >5 km strike length between Resurrection Ridge and Cadillac Valley.
-
Prior mining at Nevada Antimony Mine and Lage Antimony Prospect documented within the project boundary.
-
Metallurgical assumptions for AuEq calculations: US$2,000/oz Au, US$35,000/t Sb (≈30 % discount), recoveries of 85 % (Au) and 70 % (Sb).
-
Regulatory & market backdrop:
- U.S. Executive Order (Mar 2025) designates antimony a “Critical Mineral” and invokes the Defense Production Act to accelerate permitting and financing for domestic projects.
-
Global supply constraints highlighted: China’s export restrictions on antimony (effective Sep 2024) increase strategic importance of U.S. projects like Limousine Butte.
-
Quotes:
- “We continue to add to the large oxide gold‑antimony mineralization footprint at Limo Butte… Phase II metallurgical testwork building on our positive results from Phase I.” – Brandon Bonifacio, President & CEO.
Notable Quotes
- “The current 2025 drill program is positively advancing with 8 holes completed and assays pending.” – Brandon Bonifacio, President & CEO.