Northwire Canada EditionThursday, July 30, 2026
Northwire
ZAC 0.060 +0.0% ELE 21.18 −1.7% GHRT 0.750 +0.0% AEM 203.13 +0.1% JTWO 0.135 +0.0% EDR 10.63 −2.8% VMXX 0.750 +5.6% K 32.71 −1.5% AGI 40.13 −1.4% VGZ 2.40 +0.8% CAN 0.055 +0.0% NVO 0.055 +0.0% ARIS 19.57 −4.2% IVN 10.59 −0.8% MCI 0.165 +0.0% MTS 0.130 +0.0% ZAC 0.060 +0.0% ELE 21.18 −1.7% GHRT 0.750 +0.0% AEM 203.13 +0.1% JTWO 0.135 +0.0% EDR 10.63 −2.8% VMXX 0.750 +5.6% K 32.71 −1.5% AGI 40.13 −1.4% VGZ 2.40 +0.8% CAN 0.055 +0.0% NVO 0.055 +0.0% ARIS 19.57 −4.2% IVN 10.59 −0.8% MCI 0.165 +0.0% MTS 0.130 +0.0%
Drill Results

Nord Precious plans fall drilling program at Castle

NTH · Price

Executive Summary

  • Independent geoscience firm Ronacher McKenzie Geoscience completed a comprehensive 3‑D model of the Castle East property, identifying 29 mineralized veins (up from five previously known).
  • The new model reveals a stockwork vein system with multiple fault bends and dilational zones that explain historic high‑grade silver intercepts.
  • Nord Precious Metals will commence a fall drilling program to test the newly modeled targets and advance toward an updated resource estimate.

Key Details

  • Data Reviewed: >75,000 m of drill core, orientation, assay, alteration, lithology, structural data, ground/airborne geophysics, downhole EM, plus regional public datasets.
  • Vein Inventory: 21 veins modeled in high‑density Area A; 8 veins in Area B – total 29 veins with varied orientations (N‑S, E‑W, NW‑SE).
  • Grade Shells: Constructed using only assays >50 g/t Ag to focus on highest‑grade zones.
  • Structural Insights: Multiple fault bends and jogs create dilational zones favorable for high‑grade mineralization; these structures underpin the exceptional grades previously reported (e.g., 6,476 g/t Ag over 3.09 m).
  • Modeling Criteria: Utilized oriented core measurements, detailed vein descriptions/classifications, inter‑hole vein spacing, and assay values.
  • Priority Drill Targets:
  • Exploration of the underexplored lower contact of the Nipissing diabase (≈215 ha) with veins projected to extend 50–80 m beyond existing drill intercepts.
  • Additional targets derived from the newly identified stockwork network and structural dilational zones.
  • Future Work: Fall drilling campaign planned to test modeled veins/targets, refine structural model, and generate data for an updated resource estimate (building on the prior 30,000 m drill program).
  • Qualified Person: Frank J. Basa, P.Eng., director and qualified person under NI 43‑101, approved all technical information.

Notable Quotes

“The identification of a stockwork vein system… fundamentally changes our understanding of the potential scale for Nord's Castle East property.” – Frank J. Basa, President & CEO


Materiality Assessment: Material – Positive (the discovery of a substantially larger vein network and planned drilling to substantiate resources represent material, forward‑looking information likely to influence investor perception).

Read the original news release →

More from Nord Precious Metals Mining Inc.